New clients save 30% on their first estimate

Claim the offer

Residential additions

Home addition estimates that price the tie-in, not just the new square footage

An addition is never a small new house. The money disappears where new framing meets old: a foundation that has to match an uneven existing footing, a roof valley that forces a tear-off of three courses of shingles, siding that no longer exists in the original profile. LEEDS estimates additions by pricing the connection points first, then the new volume, so your number holds once the first wall is opened.

Tie-in scope itemizedSecond stories and bump-outsPermit and weather protection included
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
House under construction with exposed wooden framing
“The conduit and wire takeoff matched what my foreman pulled from the drawings almost to the foot. Labor hours were realistic for our crews. It is the first outsourced estimate I did not have to redo.”
Dana OkaforOwner, Okafor Electric

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Trustpilot
“The conduit and wire takeoff matched what my foreman pulled from the drawings almost to the foot. Labor hours were realistic for our crews. It is the first outsourced estimate I did not have to redo.”

Dana Okafor

Owner, Okafor Electric · Houston, TX

Trustpilot
“Squares, underlayment, flashing lengths, fastener counts, even the ridge vent. The waste factors were right for the roof pitch. Bid-ready out of the box.”

Greg Lindqvist

Estimator, Summit Roofing Co. · Kansas City, MO

Direct
“We feed every lender package through LEEDS. The documentation standard is high enough that underwriting has never asked for a second opinion.”

Sarah McAllister

Director of Preconstruction, Harborline Developments · Tampa, FL

Scope of takeoff

Addition scope we quantify

New construction and tie-in work measured separately so allowances are visible and change orders are rare.

Scroll through all 12 line items

Foundation extension

Footings, stem walls or piers matched to existing depth, with dowels into the old footing and waterproofing at the joint

LF / CYFoundation plan and existing-condition notes

Floor system and subfloor

Joists, rim board, beams, posts and sheathing, with sistering or ledger attachment to existing framing

SF / EAFraming plans and span tables

Wall and second-story framing

Studs, headers, shear panels, hold-downs and LVL beams, including temporary shoring of the existing roof

LF / SF / EAFloor plans, elevations and structural notes

Roof tie-in and new roofing

Rafters or trusses, valleys, flashing, ridge extension and tear-off of the existing roof edge

SQ / LFRoof plan and pitch measurements

Windows, doors and sunroom glazing

Units from schedule, headers, flashing, plus glass walls and thermal-break systems for sunrooms

EA / SFWindow and door schedules

Siding, trim and matching

New cladding, partial or full-elevation replacement for blending, soffit, fascia and corner trim

SF / LFElevations with existing-profile verification

Insulation and air sealing

Batts, spray foam or dense-pack to current energy code, with continuous air barrier at the transition

SFEnvelope sections and code tables

MEP extensions

Branch circuits, subpanel, mini-split or duct extension, supply and drain lines, venting and gas stubs

EA / LFSystems sketches and load calculations

Interior finishes

Drywall, trim, paint, flooring blends and cabinetry in the new space and the adjoining rooms

SF / LFFinish schedule and room plans

Garage conversion work

Slab insulation, raised floor, infilled door opening, egress window and added mechanical load

SF / EAExisting plan and conversion sketch

Selective demolition and protection

Wall openings, roof edge removal, temporary enclosure, floor protection and dust barriers

SF / WKSDemolition plan and schedule duration

Permits, engineering and allowances

Plan review fees, structural letters, survey, utility upgrades and fixture allowances

LSJurisdiction fee tables and owner selections

Overview

How an addition estimate differs from new construction

A home addition estimate quantifies two projects at once: the new structure and the alterations that make it part of the existing house.

The new work is conventional, with footings, stem walls, floor system, framing, roofing, windows, mechanical rough-in and finishes. The alteration work is where estimates go wrong, because it depends on conditions that drawings rarely show, such as the true depth of the old footing, the actual size of the ceiling joists or whether a bearing wall hides a duct run. Each of those unknowns is carried as a named allowance, so the owner sees the risk in the budget instead of discovering it with a sledgehammer.

We separate the two in the workbook. Selective demolition of exterior walls, header installation in bearing openings, shoring, sistering of existing joists, extension of HVAC trunk lines and subpanel capacity checks are each priced as their own lines. Temporary weather protection, dust barriers and daily cleanup are carried as time-based costs, because an open wall in November costs more than the same wall in June, and a second-story lift can leave a roof open for weeks. Winter-open walls also add heater rental, tarps, and extra drying time before insulation and drywall can close the envelope.

Finish matching gets the same treatment. Hardwood that has to be blended across a doorway, siding that has to be replaced on a full elevation to hide a seam, and paint that must continue through adjoining rooms are quantified so the homeowner sees them in the base price instead of as change orders. Permit, engineering and utility upgrade costs close the estimate, so the number the owner approves is the number they pay. Allowances for cabinets, plumbing fixtures and lighting carry unit budgets, which makes upgrade conversations quick and the contract easy to adjust.

Estimate types

What type of home addition estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

01

Feasibility budget

A per-square-foot range with the tie-in and structural unknowns flagged, built from a sketch or a first design pass.

Accuracy
±15-20%
Turnaround
24 hours
02

Design-development estimate

Assembly-based pricing from DD drawings with named allowances for cabinets, tile, fixtures and windows.

Accuracy
±8-10%
Turnaround
48 hours
03

Fixed-price bid estimate

Full takeoff of every trade from permit drawings, with documented exclusions and an alternates list.

Accuracy
±4-6%
Turnaround
48-72 hours
04

Second-story structural estimate

Focused pricing of shoring, new floor system, stair, roof lift and temporary roofing for vertical additions.

Accuracy
±6-8%
Turnaround
48 hours
05

Change-order pricing

Quick pricing of owner-requested changes and unforeseen conditions found after demolition, with labor and material split.

Accuracy
±3-5%
Turnaround
Same day

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

Upload plans and scope
  1. 1

    Step 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Step 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Step 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Step 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  • Tie-in work is priced as its own section so owners can see exactly what the connection to the old house costs.
  • Foundation extensions are quantified with dowels, matching depths and waterproofing at the new-to-old joint, not as a plain footing.
  • Second-story estimates include shoring, temporary roofing and the weather days that an open roof will realistically cost.
  • Siding, flooring and paint matching is quantified by elevation or room so the base price already reflects a seamless finish.
  • Allowances for cabinets, plumbing fixtures, tile and lighting are written with unit budgets you and the owner can adjust.
  • Permit, structural engineering, survey and utility upgrade fees are estimated for the specific jurisdiction.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

.xlsx

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

.pdf

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

.xlsx

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

.xlsx

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

.pdf

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

.pdf

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Free quote

Get a fixed quote for this scope

Upload drawings or a plan link and tell us the bid date. A senior estimator confirms scope, price and delivery before any work starts.

  • Scope confirmation and a fixed price within two business hours
  • Most estimates delivered in 24–48 hours
  • Unlimited revisions until bid day
  • Plans stay confidential and are deleted on request

Prefer to talk? Call +1 (800) 555-0199 or email info@leedsestimating.com.

Plans and documents

Drop your plans here or browse

PDF, DWG, DXF, ZIP, PNG, JPG, JPEG, WEBP, XLS, XLSX, DOC, DOCX, CSV · up to 5 files · 4.0 MB total

Plans stay confidential. Reply within 2 business hours.

Nationwide

Priced for your zip code in all 50 states

Labor rates, material costs and code requirements are adjusted to the project location, not a national average.

Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming

FAQ

Home Addition Estimating FAQs

Straight answers on scope, turnaround, pricing and deliverables.

Why do home additions cost more per square foot than new homes?

Additions carry fixed costs a new house spreads over more area: mobilization, tie-in carpentry, demolition, temporary protection and matching finishes. The new volume is often cheaper per foot than the connection work. We separate both so you can see which part of the number is square footage and which is the transition.

Can you estimate a second-story addition without opening the walls?

Yes, with documented assumptions. We price the likely condition of the existing foundation, bearing walls and ceiling joists from photos, original plans or field notes, then carry an explicit contingency for what only demolition will reveal. The estimate lists each assumption so a surprise becomes a priced alternate, not a dispute.

Do you include permits and engineering in an addition estimate?

We include plan review fees, structural engineer letters, surveys and utility connection charges as line items, using the fee schedule of the jurisdiction. If you prefer to carry them as an owner cost we show them as a separate subtotal so the contract price stays clean.

How do you handle matching existing siding or flooring?

We quantify the match by actual need: full-elevation siding replacement when profiles are discontinued, sand and refinish across thresholds for hardwood, and paint continuation to the nearest natural break. Each is a visible line, so the owner can choose between blending and a visible change.

Will the existing HVAC and electrical panel handle the addition?

We run a load check from the existing nameplate data and the new square footage. When the panel or furnace is undersized, the estimate carries a subpanel, service upgrade or separate mini-split system, so the cost appears at bid time and not after rough-in inspections.

What does a garage conversion estimate include?

Slab or raised floor insulation, infill framing of the overhead door opening, egress window, wall and ceiling insulation to code, drywall, flooring, added HVAC capacity and electrical circuits. We also flag setback and parking-count rules that some jurisdictions apply to conversions. It also confirms whether the old room's heating and cooling can be extended or must be replaced.

Ready for a home addition estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.