Foundation extension
Footings, stem walls or piers matched to existing depth, with dowels into the old footing and waterproofing at the joint
New clients save 30% on their first estimate
Claim the offerResidential additions
An addition is never a small new house. The money disappears where new framing meets old: a foundation that has to match an uneven existing footing, a roof valley that forces a tear-off of three courses of shingles, siding that no longer exists in the original profile. LEEDS estimates additions by pricing the connection points first, then the new volume, so your number holds once the first wall is opened.

“The conduit and wire takeoff matched what my foreman pulled from the drawings almost to the foot. Labor hours were realistic for our crews. It is the first outsourced estimate I did not have to redo.”
Reviews
What general contractors, subcontractors and developers say after bidding with our numbers.
“The conduit and wire takeoff matched what my foreman pulled from the drawings almost to the foot. Labor hours were realistic for our crews. It is the first outsourced estimate I did not have to redo.”
Dana Okafor
Owner, Okafor Electric · Houston, TX
“Squares, underlayment, flashing lengths, fastener counts, even the ridge vent. The waste factors were right for the roof pitch. Bid-ready out of the box.”
Greg Lindqvist
Estimator, Summit Roofing Co. · Kansas City, MO
“We feed every lender package through LEEDS. The documentation standard is high enough that underwriting has never asked for a second opinion.”
Sarah McAllister
Director of Preconstruction, Harborline Developments · Tampa, FL
Scope of takeoff
New construction and tie-in work measured separately so allowances are visible and change orders are rare.
Scroll through all 12 line items
Overview
A home addition estimate quantifies two projects at once: the new structure and the alterations that make it part of the existing house.
The new work is conventional, with footings, stem walls, floor system, framing, roofing, windows, mechanical rough-in and finishes. The alteration work is where estimates go wrong, because it depends on conditions that drawings rarely show, such as the true depth of the old footing, the actual size of the ceiling joists or whether a bearing wall hides a duct run. Each of those unknowns is carried as a named allowance, so the owner sees the risk in the budget instead of discovering it with a sledgehammer.
We separate the two in the workbook. Selective demolition of exterior walls, header installation in bearing openings, shoring, sistering of existing joists, extension of HVAC trunk lines and subpanel capacity checks are each priced as their own lines. Temporary weather protection, dust barriers and daily cleanup are carried as time-based costs, because an open wall in November costs more than the same wall in June, and a second-story lift can leave a roof open for weeks. Winter-open walls also add heater rental, tarps, and extra drying time before insulation and drywall can close the envelope.
Finish matching gets the same treatment. Hardwood that has to be blended across a doorway, siding that has to be replaced on a full elevation to hide a seam, and paint that must continue through adjoining rooms are quantified so the homeowner sees them in the base price instead of as change orders. Permit, engineering and utility upgrade costs close the estimate, so the number the owner approves is the number they pay. Allowances for cabinets, plumbing fixtures and lighting carry unit budgets, which makes upgrade conversations quick and the contract easy to adjust.
Estimate types
Match the estimate to where your project is. Every option is priced as a flat fee before work begins.
A per-square-foot range with the tie-in and structural unknowns flagged, built from a sketch or a first design pass.
Assembly-based pricing from DD drawings with named allowances for cabinets, tile, fixtures and windows.
Full takeoff of every trade from permit drawings, with documented exclusions and an alternates list.
Focused pricing of shoring, new floor system, stair, roof lift and temporary roofing for vertical additions.
Quick pricing of owner-requested changes and unforeseen conditions found after demolition, with labor and material split.
Process
Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.
Step 1
Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.
Step 2
Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.
Step 3
Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.
Step 4
A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.
Why LEEDS
An estimating desk that behaves like an extension of your team, not a software subscription.
Deliverables
Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.
Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.
Color-coded takeoff drawings showing exactly where every measured quantity came from.
Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.
Crew-based labor hours and productivity rates so you can check the schedule against the estimate.
Every clarification, allowance and exclusion documented so your proposal scope is defensible.
A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.
Free quote
Upload drawings or a plan link and tell us the bid date. A senior estimator confirms scope, price and delivery before any work starts.
Prefer to talk? Call +1 (800) 555-0199 or email info@leedsestimating.com.
Nationwide
Labor rates, material costs and code requirements are adjusted to the project location, not a national average.
FAQ
Straight answers on scope, turnaround, pricing and deliverables.
Additions carry fixed costs a new house spreads over more area: mobilization, tie-in carpentry, demolition, temporary protection and matching finishes. The new volume is often cheaper per foot than the connection work. We separate both so you can see which part of the number is square footage and which is the transition.
Yes, with documented assumptions. We price the likely condition of the existing foundation, bearing walls and ceiling joists from photos, original plans or field notes, then carry an explicit contingency for what only demolition will reveal. The estimate lists each assumption so a surprise becomes a priced alternate, not a dispute.
We include plan review fees, structural engineer letters, surveys and utility connection charges as line items, using the fee schedule of the jurisdiction. If you prefer to carry them as an owner cost we show them as a separate subtotal so the contract price stays clean.
We quantify the match by actual need: full-elevation siding replacement when profiles are discontinued, sand and refinish across thresholds for hardwood, and paint continuation to the nearest natural break. Each is a visible line, so the owner can choose between blending and a visible change.
We run a load check from the existing nameplate data and the new square footage. When the panel or furnace is undersized, the estimate carries a subpanel, service upgrade or separate mini-split system, so the cost appears at bid time and not after rough-in inspections.
Slab or raised floor insulation, infill framing of the overhead door opening, egress window, wall and ceiling insulation to code, drywall, flooring, added HVAC capacity and electrical circuits. We also flag setback and parking-count rules that some jurisdictions apply to conversions. It also confirms whether the old room's heating and cooling can be extended or must be replaced.
Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.