New clients save 30% on their first estimate

Claim the offer

Division 03 · Concrete

Concrete estimating that separates every cubic yard from the forms around it

A concrete bid fails when volume is the only number anyone checked. Our estimators break cast-in-place work into footings, grade beams, slabs on grade, walls, columns and elevated decks, then measure formwork contact area, finishing, curing and placement for each. Mix designs are read against ACI 318 and the specification, waste and overpour are applied by element, and the pump, chute or crane decision is priced instead of assumed.

ACI 318 mix reviewSFCA formwork takeoffPump vs chute pricing
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Crew leveling freshly poured concrete with power tools

Concrete, Masonry & Steel

3%

typical overpour allowance we carry on slabs on grade

  • ACI 318 mix review
  • SFCA formwork takeoff
  • Pump vs chute pricing
3%

typical overpour allowance we carry on slabs on grade

24–48 hours

Typical turnaround

03

CSI divisions

XLSX · PDF

You receive

Overview

How concrete work is broken down for a bid

Concrete is priced in layers.

The first is volume: every footing, pier, foundation wall, slab and deck is computed in cubic yards from the structural drawings, with each element kept separate because strength, placement method and waste differ. A 4,000 psi spread footing and a 5,000 psi post-tensioned deck should never sit in the same line.

The second layer is everything that surrounds the concrete: formwork measured in square feet of contact area, shoring for elevated slabs, embeds, sleeves, vapor barrier, joint fillers, curing compound and finishing in square feet by finish class. Rebar is tracked in tons as a separate package so you can price it in house or subcontract it.

The third layer is the field condition. Pump versus chute, crane and bucket on tight sites, cold-weather blankets and heated enclosures, winter admixtures, night pours and testing all move the number. We price those conditions from the schedule and site plan, not from a flat percentage.

Concrete scopes we measure and price

Each element is measured on its own line with the mix, forming method and placement method attached.

  • Footings and grade beamsCY

    Continuous and spread footings, pile caps and grade beams by strength class

  • Slabs on gradeCY / SF

    Thickness, vapor barrier, base stone, thickened edges and control joints

  • Foundation and retaining wallsCY / LF

    Height, thickness, pilasters, keyways and waterstop at construction joints

  • Columns and piersCY / EA

    Round and rectangular columns with tie spacing and cover per drawings

  • Elevated slabs and decksCY / SF

    Metal deck composite, one-way, two-way and post-tensioned slabs

  • Formwork contact areaSFCA

    Wall, column, edge and soffit forms with reuse factors and stripping

  • Shoring and reshoringSF / EA

    Shore towers, beams and reshores for elevated pours across floors

  • Embeds, anchor bolts and sleevesEA

    Plates, weld studs, anchor rods, dowels and blockouts

  • Finishing and curingSF

    Broom, trowel, burnish and exposed finishes, plus curing compound or blankets

  • Placement and pumpingCY / HRS

    Concrete pump, boom, chute or crane and bucket, with minimum load fees

  • Cold-weather and hot-weather workLS / SF

    Blankets, heaters, accelerators, retarders and ice or chilled water

  • Testing and labor hoursEA / HRS

    Cylinders, slump, slab flatness and crew hours by placement and finish

Estimate types

What type of concrete estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Estimate typeAccuracyTurnaroundBest for

Hard-bid concrete estimate

Volumes, forms, finishing, placement and labor by element and floor from a full structural set, with rebar tonnage carried as a separate package.

±4–6%48 hoursCompetitive concrete subcontract bids

Foundation-only package

Footings, piers, grade beams, foundation walls and slab on grade priced as a stand-alone scope for early site and structure releases.

±5%24 hoursFast-track foundation packages

Cubic yard and SFCA takeoff

Measured volumes and formwork area with waste and reuse factors shown, for shops that price labor and material themselves.

Quantities only24 hoursConcrete contractors with in-house rates

Conceptual structure budget

Cost per square foot of floor area and cubic yards per floor from schematic framing, used to test structural systems before drawings mature.

±12%24–48 hoursDesign-build and early budgeting

Value-engineering comparison

Side-by-side pricing of alternate slab thickness, mix strength or forming systems so the team sees real savings before a design change.

±6%48 hoursCost reduction exercises

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

Upload plans and scope
  1. 1

    Step 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Step 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Step 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Step 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  1. 01

    Volumes broken out by element and strength class, so a 5,000 psi deck is never averaged into 3,000 psi footings.

  2. 02

    Formwork measured as contact area with reuse factors, not guessed as a percentage of concrete cost.

  3. 03

    Pump, chute, conveyor and crane-and-bucket, placement priced against the actual site access and pour sequence.

  4. 04

    Cold-weather protection, accelerators and heated enclosures carried when the schedule runs through winter.

  5. 05

    Rebar tonnage delivered as a separate package, so you can sub it out or price it with your own supplier.

  6. 06

    Slab finishing priced by finish class and flatness tolerance, including exposed and polished floors.

  7. 07

    Waste, overpour and subgrade tolerance applied, by element rather than a blanket five percent.

  8. 08

    Reshoring and stripping sequences reflected, in the labor hours for multi-story elevated structures.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

XLSX

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

PDF

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

XLSX

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

XLSX

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

PDF

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

PDF

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Clients

Who relies on our estimates

From single-trade subs to national developers, every client gets the same measured-twice standard.

General Contractors Subcontractors Developers & Owners Design-Build Firms

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Google
“Lumber lists, finish schedules and allowances in a format our clients actually understand. The assumptions log alone has saved us from two scope disputes.”

Luis Herrera

Project Manager, Sierra Ridge Homes · Phoenix, AZ

Trustpilot
“Squares, underlayment, flashing lengths, fastener counts, even the ridge vent. The waste factors were right for the roof pitch. Bid-ready out of the box.”

Greg Lindqvist

Estimator, Summit Roofing Co. · Kansas City, MO

Google
“We were turning down bids because our two in-house estimators were buried. LEEDS gave us division-by-division numbers in 48 hours that leveled cleanly against our sub quotes. We bid 40% more work last quarter and our hit rate went up, not down.”

Marcus Whitfield

Chief Estimator, Whitfield Commercial Builders · Charlotte, NC

FAQ

Concrete Estimating FAQs

How much waste do you add to a concrete takeoff?

It depends on the element. Slabs on grade usually carry two to four percent for subgrade variation and overpour, formed walls and columns carry less, and footings poured against earth carry more. We show the percentage on each line so you can adjust it to your crew and soil conditions.

Is formwork priced separately from the concrete?

Yes. Formwork is measured as square feet of contact area for every wall, column, edge and soffit face, then priced with a reuse factor, stripping labor and any shoring. Keeping it separate lets you evaluate forming systems and reuse without disturbing the cubic yard count.

Do you include rebar in the concrete estimate?

Rebar is quantified in tons and delivered as its own package, because most contractors either subcontract reinforcing or buy fabricated steel directly. We can carry it into the concrete total or leave it out, whichever matches your bid form.

Can you price pump versus chute placement?

Yes. We review site access, pour size, pour height and sequence, then price a pump with boom or line, a chute from the truck, or crane and bucket. Minimum load fees, standby time and short-load charges are included so the placement cost reflects real deliveries.

How do you handle cold-weather concrete?

When the schedule puts pours between roughly November and March, we add heated enclosures, insulating blankets, hot water or accelerators, and extended curing per ACI 306 guidance. These appear as their own lines so they can be removed if the schedule moves into warmer months.

What turnaround should we expect for a concrete estimate?

Foundation packages and small commercial buildings usually return within 24 to 48 hours. Multi-story structures with post-tensioned decks take longer because of the volume of sections and details, and we confirm the delivery date before the takeoff begins.

Ready for a concrete estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.