New clients save 30% on their first estimate

Claim the offer

Divisions 31, 32 and 33 · Sitework

Sitework estimates that start with the dirt and end at the striping

Site packages move more money per drawing than any other trade, and the biggest errors hide in the earth. A 2 foot grade error across 6 acres is 19,000 cubic yards of soil, and one missed storm run can add a trench box and a week of dewatering. Our estimators build surfaces, balance cut and fill, measure utilities by invert and pipe size, and price paving by the ton.

Yellow excavator in a dirt field
19,360 CY
Surface-based earthwork Utilities by invert Asphalt in tons
5,000+Projects estimated
24–48hTypical turnaround
40+Trade categories
98%Takeoff accuracy

Scope of takeoff

Sitework quantities we take off

Earthwork in volumes, utilities in lengths by size, surface work in area and tons.

AC / EA

Clearing and grubbing

Tree and brush removal, stump grinding, topsoil strip and stockpile, by area and tree count

Site plan limits of disturbance and tree survey

SF / LF

Demolition and utility abandonment

Existing paving, curb, foundations and abandoned lines removed and hauled

Demolition plan and survey

CY

Cut and fill earthwork

Mass grading by surface model with swell, shrink and balance or export calculation

Existing and proposed surfaces, grid or TIN volumes

CY / LF

Trench excavation and backfill

Utility trenches by depth class with bedding, pipe zone and compacted backfill

Invert elevations from plan and profile

LF / EA

Storm drainage piping

RCP, HDPE and PVC pipe by diameter from 12 to 60 inches, with inlets, manholes and headwalls

Storm plan and profile sheets

LF / EA

Water, sewer and fire service

Ductile iron, C900 and PVC mains and services with valves, hydrants, taps and thrust restraint

Utility plans and details

SY / TON

Subgrade and aggregate base

Fine grading, geotextile, lime or cement stabilization and crushed stone base by thickness

Pavement sections and geotechnical report

TON / SY

Asphalt paving

Binder and surface course by thickness and tack coat, converted from area to tons at 110 lbs per SY per inch

Paving plan area times section thickness

LF / SF

Concrete paving, curb and sidewalk

Curb and gutter, flatwork, ADA ramps with detectable warning, dumpster pads and aprons

Site plan and standard details

LF / EA

Striping, signage and wheel stops

Parking stalls, crosswalks, directional arrows, accessible symbols and signs

Striping plan and ADA layout

LF / EA

Erosion and sediment control

Silt fence, inlet protection, construction entrance, sediment basins and stabilization seeding

SWPPP plan and erosion control sheet

LS / WK

Dewatering, traffic control and mobilization

Pump systems, shoring, flaggers and equipment mobilization by phase

Geotech groundwater data and phasing plan

Overview

What a sitework estimate has to measure

Sitework is estimated in the order the work is built. We start with clearing and demolition measured in acres and linear feet, then model existing and proposed surfaces to calculate cut and fill volumes in cubic yards, adjusted for swell, shrinkage and the topsoil strip. Geotechnical reports decide the rest: unsuitable soil removal, rock allowances, imported structural fill and subgrade stabilization.

Underground utilities are the second major scope. Storm drain, sanitary sewer, water, fire service and conduit are measured by pipe size and material from the plan and profile sheets, with trench depth taken from inverts so excavation, bedding, backfill and shoring are priced by actual cover. Structures such as manholes, inlets and vaults are counted separately.

Finally, surface improvements: base course and asphalt in tons, concrete paving, curbs and gutters in linear feet, sidewalks, striping, signage and landscape restoration. Erosion control, dewatering and traffic control run across every phase and are priced as their own lines.

What type of sitework estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Full sitework bid estimate

±5–6%72 hours

Complete Division 31, 32 and 33 pricing with earthwork volumes, utilities by size, paving tons and site concrete from civil construction documents.

Best for: Site contractors and GC self-perform

Earthwork volume and balance study

±3–4%48 hours

Surface-based cut and fill with swell and shrink factors, topsoil management and haul-in or haul-out recommendations.

Best for: Grading contractors and developers

Utility package pricing

±5%48 hours

Storm, sanitary, water and fire service by size and depth, with structures, tie-ins, testing and restoration allowances.

Best for: Underground utility contractors

Paving and striping estimate

±4%24–48 hours

Asphalt and concrete pavement sections, curb and gutter, ADA ramps and striping priced by the ton, SY and LF.

Best for: Paving contractors

Conceptual site budget

±12%24 hours

Cost-per-acre and cost-per-stall budgets from concept plans, with risk allowances for soils and utilities clearly flagged.

Best for: Developers and land acquisition

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  1. 01

    Earthwork built from surface models with swell and shrink factors, instead of average-end-area guesses that drift on larger sites.

  2. 02

    Trench volumes calculated from actual invert, depth so shoring and trench-box costs appear where depth justifies them.

  3. 03

    Asphalt converted to tons using section thickness and density, with tack coat, patching and milling called out separately.

  4. 04

    Geotechnical reports read for unsuitable soils, groundwater, rock and stabilization requirements before pricing.

  5. 05

    Storm, sewer and water measured on plan and, profile sheets, structure by structure, with tie-ins and testing allowances.

  6. 06

    SWPPP and erosion control priced across each phase, not as one allowance on the last line.

  7. 07

    Haul distance, disposal fees and import fill, sources adjusted to the specific project location.

  8. 08

    Delivered in a workbook that separates self-perform, from subcontract scopes so you can bid your way.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

.xlsx

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

.pdf

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

.xlsx

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

.xlsx

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

.pdf

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

.pdf

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Project types

Project types we estimate

The same measured-twice standard applies whether the scope is a tenant improvement or a ground-up campus.

Yellow excavator in a dirt field
01

Retail pads and shopping centers

Tracked excavator working on a graded gravel site under a wide sky
02

Warehouse and distribution campuses

Structural steel frame of a large building being erected with mobile cranes
03

Multifamily garden-style communities

Aerial view of a crew in high-visibility vests screeding and finishing a fresh concrete slab
04

School and university sites

Hands typing on a laptop displaying a cost spreadsheet in an open office
05

Healthcare campuses

Scale ruler resting on a set of architectural drawings
06

Residential subdivisions

Multi-story building wrapped in scaffolding under a blue sky
07

Parking structures and lots

Yellow excavator in a dirt field
08

Industrial yards and laydown areas

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Google
“Duct takeoff by gauge and size, equipment schedules, hangers, insulation. They understand sheet metal. Turnaround was 36 hours on a 90,000 square foot clinic.”

Tom Beaulieu

President, Beaulieu Mechanical · Minneapolis, MN

Trustpilot
“Cubic yards, rebar tonnage, formwork contact area and block counts by size. Exactly how I think about a job. We have won four of the last five bids they priced.”

Jamal Reed

Owner, Reed Concrete & Masonry · Birmingham, AL

Trustpilot
“Squares, underlayment, flashing lengths, fastener counts, even the ridge vent. The waste factors were right for the roof pitch. Bid-ready out of the box.”

Greg Lindqvist

Estimator, Summit Roofing Co. · Kansas City, MO

FAQ

Sitework Estimating FAQs

How do you calculate cut and fill volumes?

We build existing and proposed ground surfaces from the survey and grading plan, compare them to produce net cut and fill, then apply swell and shrinkage factors from the geotechnical report. The result shows whether the site balances or needs import or export, and topsoil is calculated separately.

How are asphalt paving quantities converted to tons?

We measure each pavement area, multiply by the section thickness and apply a density of roughly 110 pounds per square yard per inch for hot mix. Base stone, tack coat and any milling are carried on separate lines so material and paving crew costs stay visible.

Do you price utilities from plan and profile sheets?

Yes. Pipe lengths are measured by size and material, invert and rim elevations set trench depth, and structures are counted separately. Depth drives excavation, bedding and shoring, so the estimate shows where deep runs add cost rather than averaging them away.

Can you handle sitework with rock or poor soils?

We read the geotechnical report for rock, groundwater and unsuitable material, then carry explicit allowances for rock excavation, undercutting and stabilization with quantities and unit prices. Those allowances are clearly flagged so the bid shows the assumption instead of hiding it.

Does the estimate include erosion control and SWPPP items?

Yes. Silt fence, inlet protection, stabilized construction entrances, sediment basins, temporary seeding and maintenance are quantified from the erosion control sheets and priced by phase. Inspection and reporting time can be included if your contract assigns it to you.

How long does a sitework estimate take?

Most civil sets are delivered in 48 to 72 hours. Earthwork studies on a single parcel can be returned in two days, and larger campuses with multiple utility systems are scheduled individually with a confirmed delivery date.

Ready for a sitework estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.