Material takeoff · Procurement

Quantity and material takeoff built for the purchase order, not just the bid

A bid quantity and a buy quantity are not the same number. Lumber arrives in 16-foot sticks, drywall in 4x12 sheets, pipe in 20-foot lengths, and every cut leaves a remainder. Our material takeoffs convert measured net quantities into purchasable units with waste applied, grouped by supplier and delivery phase, so your buyer can request quotes the same afternoon the list arrives.

Waste factors by materialSupplier quote packagesLocation-adjusted pricing option
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch

Scope we take off

12 items
  • Structural lumber and engineered woodEA / LF / MBF
  • Sheet goodsSHT / SF
  • Concrete and reinforcing steelCY / TON
  • Masonry units and mortarEA / PALLET / BAG
  • Pipe, fittings and valvesLF / EA
  • Conduit, wire and devicesLF / EA / REEL
See all 12 line items
5,000+Projects estimated
24–48hTypical turnaround
40+Trade categories
98%Takeoff accuracy

Scope of takeoff

Material groups we convert to buy quantities

Each group is rounded to supplier stock sizes, with net quantity, waste and order quantity shown side by side.

Structural lumber and engineered wood

Studs, joists, LVL beams and I-joists rounded to stock lengths with cut-list optimization

EA / LF / MBFFraming plans converted to stock-length cut lists

Sheet goods

OSB, plywood and gypsum board in 4x8, 4x10 and 4x12 sheets with layout waste

SHT / SF

Concrete and reinforcing steel

Ready-mix by mix design with over-excavation allowance, rebar by bar size and bundle

CY / TON
Scale ruler resting on a set of architectural drawings

Masonry units and mortar

CMU and brick by pallet count, with mortar, grout and reinforcement bags

EA / PALLET / BAG

Pipe, fittings and valves

Pipe by nominal size and 10 or 20-foot stock lengths, with fitting counts by type

LF / EA

Conduit, wire and devices

Reels, boxes, devices and plates, rounded to spool and carton quantities

LF / EA / REEL

Roofing and insulation materials

Shingle squares, membrane rolls, insulation boards and batts by bundle and roll

SQ / ROLL / SF

Fasteners and accessories

Nails, screws, anchors, hangers, connectors and sealants by box and case

LBS / BOX / CSRatios tied to the primary material they secure

Doors, windows and hardware

Units by mark with frame, hardware set and finish, grouped for a single supplier quote

EA
Hands typing on a laptop displaying a cost spreadsheet in an open office

Finish materials

Tile, flooring, paint and trim by box, carton, gallon and stick

BOX / GAL / LF

Delivery phasing and staging

Material list split by construction phase, lead time and laydown capacity

LS

Supplier quote package

Request for quotation sheets by supplier trade with specs, sizes and quantities

LS

Overview

From measured quantity to purchasable material list

Quantity takeoff measures what the drawings show. Material takeoff, often abbreviated MTO, translates those measurements into what a supplier will actually ship. A 1,200 linear foot wall becomes 900 studs at 16 inches on center, 150 plates, 38 sheets of drywall per side and the screws, tape and compound that go with them, each rounded to the stock length or package the supplier sells. Stock lengths are checked against what regional suppliers actually carry, so a list never calls for 18-foot lumber that the yard stocks only in 16.

We build the bill of quantities in the order a buyer thinks: by material family, by supplier trade and by delivery phase, so footing steel is requested months before finish hardware. Waste factors are set per material and per condition, because cutting drywall in a rectangular room is nothing like cutting it around a stair, and the factors are visible so your purchasing team can adjust them. Rounding happens at the order level, not the line level, which prevents ten small round-ups from quietly adding a full unit of material to every category.

When requested, we package each material group into a clean request for quotation with specifications, sizes and quantities, ready to send to your suppliers. A location-adjusted pricing option attaches current unit prices for your zip code, giving you a benchmark to hold supplier quotes against. Quotes returned by suppliers can be dropped straight into the same sheet, producing a side-by-side comparison of price, lead time and delivery terms for each material group, so the cheapest compliant supplier is obvious to everyone reviewing the buyout.

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

What type of quantity & material takeoff can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Single-trade material list

Within 2-3% of final purchase12-24 hours

A purchasable material list for one trade, such as framing or drywall, with stock sizes and waste applied.

Best for: Subcontractors buying their own material

Whole-building bill of quantities

Within 3-4% of final purchase48-72 hours

Quantities grouped by material family across the entire building, formatted for a purchasing agent and project manager.

Best for: GCs and developers procuring direct

Supplier quote package

Matches material list24 hours after list

Material groups packaged as separate requests for quotation, each with specifications and quantities ready to email.

Best for: Buyers comparing supplier pricing

Priced material list

Typically +/-6% on material pricing48-72 hours

The material list with current unit prices for the project zip code, useful as a benchmark against supplier quotes.

Best for: Budget checks and quote validation

Phased procurement schedule

Tied to schedule baseline72 hours

The material list sorted by need-by date and lead time, so long-lead items are ordered first.

Best for: Projects with tight supply chains

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

Scale ruler resting on a set of architectural drawings
  • Quantities are converted to the units suppliers actually sell, such as 16-foot studs, 4x12 sheets, pallets and reels, not abstract square feet.

  • Waste factors are set material by material and condition by condition, and every factor is visible so your buyer can raise or lower it.

  • Material groups are sorted by supplier trade and delivery phase, which means requests for quotation can go out without reorganizing the file.

  • Cut-list optimization for lumber and rebar, reduces offcuts and keeps the order closer to what the crew will really use.

Hands typing on a laptop displaying a cost spreadsheet in an open office
  • Our supplier quote packages carry full specifications, avoiding the back-and-forth that follows an incomplete material request.

  • The optional pricing layer is localized to the project zip code, giving procurement a defensible benchmark before quotes arrive.

  • Revisions after design changes are tracked, so the material list stays aligned with the latest drawing revision.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

.xlsx

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

.pdf

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

.xlsx

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

.xlsx

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

.pdf

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

.pdf

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Free quote

Get a fixed quote for this scope

Upload drawings or a plan link and tell us the bid date. A senior estimator confirms scope, price and delivery before any work starts.

  • Scope confirmation and a fixed price within two business hours
  • Most estimates delivered in 24–48 hours
  • Unlimited revisions until bid day
  • Plans stay confidential and are deleted on request

Prefer to talk? Call +1 (800) 555-0199 or email info@leedsestimating.com.

Plans and documents

Drop your plans here or browse

PDF, DWG, DXF, ZIP, PNG, JPG, JPEG, WEBP, XLS, XLSX, DOC, DOCX, CSV · up to 5 files · 4.0 MB total

Plans stay confidential. Reply within 2 business hours.

CSI divisions

CSI MasterFormat divisions we cover

Estimates are organized by division so they drop straight into your cost codes and schedule of values.

01General Requirements
02Existing Conditions
03Concrete
04Masonry
05Metals
06Wood, Plastics & Composites
07Thermal & Moisture Protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
21Fire Suppression
22Plumbing
23HVAC
25Integrated Automation
26Electrical
27Communications
28Electronic Safety & Security
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
35Waterway & Marine Construction
40Process Interconnections
41Material Processing & Handling
44Pollution & Waste Control Equipment
48Electrical Power Generation

Highlighted divisions are the primary scope on this page.

FAQ

Quantity & Material Takeoff FAQs

What is the difference between quantity takeoff and material takeoff?

Quantity takeoff measures net amounts from the drawings, such as square feet of wall. Material takeoff converts those amounts into the products you must buy, with waste, stock lengths and package sizes applied. If your goal is purchasing, the material takeoff is the document your buyer actually needs.

How do you choose waste factors?

We start with industry norms by material, for example 5% for drywall, 7-10% for framing lumber and 10-15% for diagonal tile layouts, then adjust for the project's geometry, such as many small rooms or complex roof planes. Every factor appears in its own column so your team can override it.

Can you prepare quote requests for my suppliers?

Yes. We split the material list into supplier trade groups and produce a request for quotation for each, listing specifications, sizes and quantities. You add your suppliers and send them out, which shortens the time between receiving drawings and having comparable prices in hand. It also speeds up the supplier response considerably.

Is pricing included in a material takeoff?

Not by default. The standard deliverable is quantities only. As an option, we attach unit prices adjusted for the project location, which gives you a benchmark to compare against supplier quotes. Labor is not included unless you request a full estimate. That keeps the list aligned with how your buyer already works.

Do you create a bill of quantities for public bids?

Yes. We structure the bill of quantities in the format the bid documents require, with item numbers, descriptions, units and quantities. Many public owners ask for unit-priced bid forms, and we align our takeoff to those line items so your pricing maps cleanly. That lets bidders price against a shared reference.

How quickly can you deliver a material list?

Single-trade material lists are typically delivered within 12 to 24 hours. A whole-building bill of quantities takes 48 to 72 hours depending on size. We confirm the schedule before starting and offer rush options when a supplier deadline or purchasing window is closing. Rush schedules carry a premium that we confirm first.

Ready for a quantity & material takeoff quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.