New clients save 30% on their first estimate

Claim the offer

Division 04 · Masonry

Masonry estimating built unit by unit, from the first course to the last lintel

Masonry looks simple until the bid reveals how many things hang on a wall: grouted cells, bond beams, ties, flashing, control joints, lintels and the scaffold that lets mason tenders reach them. Our estimators convert wall elevations into unit counts for block, brick and stone, then build the mortar, grout, steel and access around them so your number covers the whole assembly, not just the face.

ASTM C90 CMUMortar and grout derivedScaffold included
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch

Scope we take off

12 items
  • CMU by size and typeEA
  • Face brick and veneerEA / M
  • MortarBAGS
  • Grout and grouted cellsCY
  • Wall reinforcementLF / TON
  • Lintels and sillsEA / LF
See all 12 line items
BR Bluebeam Revu
P PlanSwift
RD RSMeans Data
S STACK
OT On-Screen Takeoff
ME Microsoft Excel

Scope of takeoff

What goes into the masonry takeoff

Walls measured from elevations, units counted by size, and the supporting materials derived from the details.

  1. 01

    CMU by size and typeEA

    8x8x16, 12x8x16 and 6x8x16 blocks, plus half, corner, bond beam and lintel units

    Wall area times units per SF, less openings

  2. 02

    Face brick and veneerEA / M

    Modular, queen and utility brick by color and texture, per thousand

    Elevation area at about 6.75 per SF

  3. 03

    MortarBAGS

    Type N, S and M mortar by bag count from units and joint thickness

    Derived per 100 units and per SF

  4. 04

    Grout and grouted cellsCY

    Fully and partially grouted cells, bond beams and lintels

    Cell volume at reinforcing spacing

  5. 05

    Wall reinforcementLF / TON

    Vertical bars in cells and horizontal joint reinforcement ladders

    Wall schedule and typical details

  6. 06

    Lintels and sillsEA / LF

    Steel angles, precast and masonry lintels, with stone or precast sills

    Opening schedule and elevations

  7. 07

    Flashing, weeps and tiesLF / EA

    Through-wall flashing, weep vents, cavity drainage and wall ties

    Wall sections and spacing requirements

  8. 08

    Control and expansion jointsLF

    Vertical joints with backer rod and sealant, and horizontal relief angles

    Elevation joint layout

  9. 09

    Insulation and cavity fillSF

    Rigid board, inserts and air barrier at cavity walls

    Wall type schedule

  10. 10

    Scaffolding and mortar mixingSF / MOS

    Frame scaffold, mast climbers, hoists and mixing stations by elevation height

    Building height and duration

  11. 11

    Cleaning and sealingSF

    Pressure washing, acid cleaning, water repellent and anti-graffiti coatings

    Finish schedule

  12. 12

    Mason and tender laborHRS

    Mason and laborer hours by unit weight, wall height and complexity

    Productivity per 1,000 units

Overview

A masonry wall is a stack of separate quantities

Masonry estimating starts with area. Every wall is measured in square feet from the elevations and plans, with openings deducted, and the unit count follows from the wall type: roughly 1.125 CMU per square foot for 8x16 face blocks, about 6.75 modular brick per square foot for single-wythe veneer. Each unit size, color, and finish becomes its own line.

The materials inside the wall come next. Mortar is derived from unit counts and joint thickness, grout in cubic yards from the cells that are filled, reinforcing bars from the wall schedule, and ties, anchors, flashing, weep vents and control joints from the details. Lintels, bond beams and sills are counted as individual pieces with their lengths.

Labor is where masonry bids are won or lost. Productivity depends on unit weight, wall height, number of corners and openings, and access. Scaffold, mortar mixing, hoisting and winter protection are often a third of the cost, so we price them from the schedule instead of assuming they are included in a mason's unit rate.

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Estimate types

What type of masonry estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

  1. 01

    Hard-bid masonry estimate

    Unit counts, grout, mortar, steel, accessories, scaffold and labor for every wall type, organized by elevation and by floor.

    Best for Masonry subcontractor bids

    Precision±4–6%
    Turnaround48 hours
  2. 02

    Block and brick unit takeoff

    Counts of each unit, shape and color with waste, delivered as a purchase list for suppliers and without labor.

    Best for Masonry yards and contractors

    PrecisionQuantities only
    Turnaround24 hours
  3. 03

    Veneer and facade budget

    Brick, stone and cast-stone facade quantities with ties, relief angles and access, priced for early cost control.

    Best for Design-development budgets

    Precision±8–10%
    Turnaround24–48 hours
  4. 04

    Restoration and tuckpointing pricing

    Repointing, unit replacement and cleaning for older buildings, measured per square foot of surface and per lineal foot of joint.

    Best for Historic and repair work

    Precision±8%
    Turnaround48 hours
Architectural scale model of a building surrounded by model trees

98%

takeoff accuracy on awarded projects

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  • Unit counts converted from wall area by size and joint thickness, with waste varying by unit type and cut density.

  • Grout quantities derived from which cells are filled, not from a rough cubic yards per wall guess.

  • Scaffold, hoists, mortar mixing and winter, protection priced from the building height and schedule.

  • Lintels, relief angles, flashing and weeps, counted as pieces and lineal feet from the wall sections.

  • ASTM C90, C216 and C270 requirements reviewed, so the unit type and mortar designation match the specification.

  • Reinforcing steel carried as a separate package, that ties to the rebar takeoff for the same structure.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

  • XLSX

    Estimate workbook

    Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

  • PDF

    Marked-up plans

    Color-coded takeoff drawings showing exactly where every measured quantity came from.

  • XLSX

    Material procurement list

    Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

  • XLSX

    Labor hours by task

    Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

  • PDF

    Assumptions and exclusions log

    Every clarification, allowance and exclusion documented so your proposal scope is defensible.

  • PDF

    Bid summary sheet

    A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Nationwide coverage

Local pricing in every US market

We adjust labor, material and equipment to the project zip code and account for the code, climate and logistics that drive cost in each region.

Northeast9 states

Union labor markets, dense urban logistics and strict code review priced in.

CTMEMANHNJNYPA+2
Midwest12 states

Weather-dependent schedules and regional material supply reflected in every line.

ILINIAKSMIMNMO+5
South16 states

Fast-growth metros where subcontractor capacity, not material, drives price.

ALARDEFLGAKYLA+9
West13 states

Seismic detailing, energy codes and the highest labor rates in the country.

AKAZCACOHIIDMT+6
Areas we serve
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming

FAQ

Masonry Estimating FAQs

Straight answers on scope, turnaround, pricing and deliverables.

How many CMU blocks are in a wall?

A standard 8x8x16 block covers 0.889 square feet of face including the mortar joint, so a wall needs about 1.125 blocks per square foot. We calculate from the actual wall area after openings, add waste for cuts and breakage, and break out special shapes such as corners and bond beam units.

Do you include grout and rebar in the masonry takeoff?

Yes. Grouted cells are measured from the reinforcing schedule in cubic yards, and vertical and horizontal reinforcement is listed in linear feet and pounds. We can deliver the steel separately for your supplier, and it ties to our rebar estimating services if the project needs both.

Can you estimate mixed masonry such as brick over block cavity walls?

Yes. Each wythe is measured separately and the cavity components, such as insulation, air barrier, ties, flashing and weeps, are added from the wall section. Labor is applied per wythe, since the production rates for face brick and backup block are quite different.

How do you price scaffolding for masonry?

Scaffold is sized from the wall elevations and building footprint, priced by the frame, erected square footage or month, and adjusted for mast climbers on taller walls. Hoist, material loading and enclosure for cold weather are included when the schedule or specification calls for them.

Do you handle restoration and tuckpointing work?

Yes. Repointing is measured in lineal feet of joint or square feet of wall, unit replacement by count, and cleaning by area. We also include scaffolding, mortar color matching, and lead or asbestos precautions when older buildings require them in the specification.

How fast can a masonry estimate be delivered?

Most commercial masonry packages are returned within 48 hours, and small block walls often in 24. Large facades with several brick colors, cast stone and pattern work take longer, and we confirm the date after seeing the elevations and details.

Ready for a masonry estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.