Building renovation

Renovation estimating that prices the unknowns before demolition finds them

Existing buildings keep secrets: asbestos tile under vinyl, a failed beam pocket behind plaster, a panel that cannot carry the new load, a fire code that applies the moment the permit is pulled. LEEDS builds renovation estimates around those risks. We quantify the visible scope, carry hazard and condition allowances openly, sequence occupied phases and give owners a contingency they can defend to a lender.

Abatement allowancesCode-triggered upgradesPhased occupied work
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
8-15%

typical unknown-conditions contingency carried on gut renovations

24–48 hours

Typical turnaround

01 · 02 · 03 · 05

CSI divisions

XLSX · PDF

You receive

Scope of takeoff

Renovation scope we quantify

Existing conditions, hazards and systems upgrades measured separately from new finishes so risk is visible.

SF / LF / LS

Hazardous material abatement

Asbestos, lead paint, mold and PCB allowances tied to survey results, with containment and disposal

Survey report quantities and unit rates

SF / CY

Selective and strip-out demolition

Ceilings, partitions, MEP removal, flooring and finishes by assembly, with hauling and recycling

Existing-condition and demolition plans

TON / SF / EA

Structural repair and upgrades

Steel reinforcement, concrete repair, shear walls, new openings and floor strengthening

Structural evaluation and engineer details

SF / SQ / LF

Envelope restoration

Windows, masonry repair, roofing, air sealing, insulation upgrades and waterproofing

Facade survey and elevations

EA / LBS / LF

Mechanical systems replacement

Rooftop units, boilers, chillers, ductwork, controls and balancing

Mechanical survey and new design

EA / LF

Electrical service and distribution

Service upgrade, panels, feeders, branch wiring, lighting and fire alarm replacement

Electrical survey and one-line

EA / LF

Plumbing and fire protection

Risers, fixtures, domestic water, sanitary lines and sprinkler heads or full systems

Plumbing plans and sprinkler requirements

EA / LS

Accessibility and life safety

Ramps, elevators, restroom upgrades, egress stairs, rated assemblies and exit signage

Code analysis and ADA checklist

SF / LF / EA

Interior build-back

New partitions, ceilings, flooring, millwork, painting and door hardware

Finish schedule and floor plans

SF / HRS / WKS

Phasing and occupied-building protection

Temporary partitions, off-hours labor premiums, dust control, relocations and protection

Phasing plan and tenant schedule

%

Unknown-conditions contingency

Contingency by risk class: concealed structure, utilities, hazardous items and code interpretation

Risk register and building age

WKS / LS

General conditions and permits

Supervision, hoisting, inspections, special inspections, utility fees and commissioning

Schedule duration and jurisdiction fees

Estimate types

What type of renovation estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

  1. 01

    Feasibility and condition budget

    A range built from site visits, age of systems and comparable gut rehab data, with every unknown listed.

    Best for Owners deciding between renovation and replacement

    Precision±15-20%
    Turnaround48 hours
  2. 02

    Phased renovation estimate

    Costs split by phase, with temporary protection, off-hour labor and relocation costs included in each.

    Best for Occupied schools, offices and healthcare facilities

    Precision±8-10%
    Turnaround72 hours
  3. 03

    Detailed bid estimate

    Full takeoff of demolition, new construction and systems with abatement and code upgrades itemized.

    Best for General contractors bidding renovation work

    Precision±5-7%
    Turnaround72 hours
  4. 04

    Risk-adjusted contingency model

    Scenario pricing that ranks unknowns by probability and cost, supporting contingency discussions with lenders.

    Best for Developers and lenders funding older buildings

    PrecisionScenario range
    Turnaround48 hours

Overview

Why renovation is priced differently from remodeling and new work

Renovation covers the upgrade of an entire building or major floor plate: an office retrofitted for a new tenant, a school modernized in summer phases, a 1960s motel converted to housing. Where remodeling reshapes rooms, renovation reworks systems, structure and compliance, so the estimate must account for what is hidden as much as what is drawn, and must say plainly which assumptions it rests on. Where existing drawings are missing, we list the field verification needed and price a measured-drawing allowance so quantities rest on reality.

We begin with a survey-based scope: existing-condition drawings, site photos, hazardous materials reports and any structural or MEP evaluations. Demolition is quantified by assembly, abatement is carried as an allowance backed by survey quantities, and new systems are priced against what the building can actually accept, such as panel capacity, riser size and floor loading. Gaps between survey and drawings are logged, not ignored. We also reconcile the abatement scope with the demolition sequence, since disturbing material before it is cleared can halt the entire project.

Code triggers are the final layer. Substantial alteration can require sprinklers, accessibility upgrades, energy compliance and seismic strengthening. We list each trigger, state our assumption about its applicability and price it, so the owner knows early which upgrades are mandatory and which are optional. The contingency that remains is sized to the building's age and the risks we could not eliminate. We document each assumption in a risk register, which owners and lenders can review and update as demolition reveals actual conditions.

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

Upload plans and scope
  1. 1

    Step 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Step 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Step 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Step 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Multi-story building wrapped in scaffolding under a blue sky

98%

takeoff accuracy on awarded projects

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  • Hazardous material allowances are tied to, survey quantities with containment, air monitoring and disposal priced separately.

  • Demolition is quantified by assembly and finish type, which gives realistic labor productivity rather than a lump sum.

  • Systems replacements are checked against existing capacity, such as electrical service, risers and structural loads.

  • Code-triggered upgrades for fire protection, accessibility, energy and seismic work are listed with our assumptions.

  • Phasing is priced: temporary partitions, after-hours labor premiums, tenant moves and protection of occupied areas.

  • Unknown-conditions contingency is built by, risk class and building age, not an arbitrary flat percentage.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

  • Estimate workbookXLSX

    Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

  • Marked-up plansPDF

    Color-coded takeoff drawings showing exactly where every measured quantity came from.

  • Material procurement listXLSX

    Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

  • Labor hours by taskXLSX

    Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

  • Assumptions and exclusions logPDF

    Every clarification, allowance and exclusion documented so your proposal scope is defensible.

  • Bid summary sheetPDF

    A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Clients

Who relies on our estimates

From single-trade subs to national developers, every client gets the same measured-twice standard.

General Contractors

Bid more work without adding estimating headcount. We deliver division-by-division numbers you can level against sub quotes.

Developers & Owners

Feasibility budgets and bid reviews that tell you whether the numbers you are seeing are fair.

Design-Build Firms

Conceptual through GMP pricing that moves as fast as your design iterations.

Construction Managers

Independent cost checks, change-order pricing and schedule-of-values support.

Lenders & Insurers

Replacement cost and draw-schedule estimates documented to underwriting standards.

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Google
“We were turning down bids because our two in-house estimators were buried. LEEDS gave us division-by-division numbers in 48 hours that leveled cleanly against our sub quotes. We bid 40% more work last quarter and our hit rate went up, not down.”

Marcus Whitfield

Chief Estimator, Whitfield Commercial Builders · Charlotte, NC

Clutch
“We use LEEDS for independent bid reviews on every multifamily deal. Their preliminary numbers have landed within 6% of final GMP on three projects in a row.”

Priya Raman

Development Manager, Northgate Partners · Denver, CO

Google
“I used to lose a whole weekend to takeoffs. Now I upload on Friday and have board counts, mud and tape, and paint gallons by Monday morning.”

Elena Vasquez

Owner, Vasquez Drywall & Paint · San Antonio, TX

Nationwide coverage

Local pricing in every US market

We adjust labor, material and equipment to the project zip code and account for the code, climate and logistics that drive cost in each region.

Northeast9 states

Union labor markets, dense urban logistics and strict code review priced in.

CTMEMANHNJNYPA+2
Midwest12 states

Weather-dependent schedules and regional material supply reflected in every line.

ILINIAKSMIMNMO+5
South16 states

Fast-growth metros where subcontractor capacity, not material, drives price.

ALARDEFLGAKYLA+9
West13 states

Seismic detailing, energy codes and the highest labor rates in the country.

AKAZCACOHIIDMT+6
Areas we serve
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming

FAQ

Renovation Estimating FAQs

How do you estimate unknown conditions in a renovation?

We review surveys, photos and the age and type of the building, then assign allowances and contingency by risk class: concealed structure, buried utilities, hazardous materials and code interpretation. Each risk is listed with a probable cost range, so owners can fund a defensible reserve and not a guess. We also recommend updating the register at each design milestone.

Do renovation estimates include asbestos and lead abatement?

They include allowances based on any hazardous materials survey you have, with quantities by material, containment, air monitoring, disposal and clearance testing. If no survey exists, we carry a conditional allowance by building age and flag that a survey should be completed before bidding. Clearance testing and waste manifests are priced as separate lines.

How do you price phased work in an occupied building?

We divide the scope into phases, add temporary partitions, dust and noise control, after-hours labor premiums, daily cleanup and relocation of tenants or equipment. Productivity is reduced for restricted access, which reflects real-world conditions better than applying the same labor rates as vacant work. Schedules also show how each phase affects tenant disruption.

What code upgrades can be triggered by a renovation?

Depending on the jurisdiction and the extent of alteration, work can trigger sprinklers, accessibility upgrades, egress improvements, energy code compliance and seismic strengthening. We analyze the likely triggers, state our assumptions and price both required and recommended items so nothing is hidden in the contingency. Each assumption is flagged for confirmation with the building official.

What is the difference between renovation and remodeling estimates?

Remodeling updates rooms and finishes, mostly in houses, driven by selections. Renovation upgrades a whole building or large area, often commercial, with abatement, structural work, replaced systems and code upgrades. The risk profile and contingency approach are different, so the estimates are structured differently. Estimators price each type by its specific risks.

Can you review an existing contractor's renovation budget?

Yes. We compare their pricing against our independent takeoff and flag missing scope, thin allowances, unrealistic productivity and omitted code work. The review is delivered as a gap list with dollar impacts, which owners and lenders often use before approving a budget or funding draw. Findings are summarized by trade and by risk.

Ready for a renovation estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.