New clients save 30% on their first estimate

Claim the offer
Red steel frame structure against a white sky

Division 07 · Fireproofing & Firestopping

Fireproofing priced by the UL design, the hourly rating and the pound of steel it protects

Two beams with the same span can need very different fireproofing. One carries a 2-hour rating under a UL design that wants 1-3/8 inches of SFRM; the other is architecturally exposed and gets an intumescent coating whose mil thickness depends on its W/D ratio. Our fireproofing estimators read the structural framing plans, the fire-resistance schedule and the UL designs the architect cited, compute the surface area of every protected member by section size, and price material, equipment and labor at the thickness each rating actually requires.

UL design thickness tablesASTM E119 ratingsFirestop by penetration type
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
W/D

the weight-to-heated-perimeter ratio we compute for every member before assigning thickness

Senior estimator reviewed

BR Bluebeam Revu
P PlanSwift
RD RSMeans Data
OT On-Screen Takeoff
ME Microsoft Excel

Scope of takeoff

Fireproofing and firestopping quantities we take off

Every member listed by section size, rating and UL design; every penetration counted by type from the MEP overlay.

SFRM on beams and girders

Cementitious and fiber SFRM by thickness per UL design for 1, 2 and 3-hour ratings, listed by section size

SF / BFMember length from framing plans times surface area per foot from steel tables

SFRM on columns

Column fireproofing at 2 and 3-hour ratings, full contour or boxed, by story height and section

SF / BF

Metal deck and joist fireproofing

SFRM on fluted and cellular deck undersides, bar joists and bridging, with bonding agent

SF
Scale ruler resting on a set of architectural drawings

Intumescent coatings

Thin-film intumescent on exposed steel by W/D ratio and dry mil thickness, with primer and topcoat

SF

Board and enclosure systems

Gypsum, calcium silicate and mineral board column and beam enclosures by layers and framing

SF

Through-penetration firestopping

Pipe, conduit, duct, cable tray and bus duct penetrations through rated walls and floors by tested system

EA

Joint and perimeter firestopping

Head-of-wall, edge-of-slab, curtain wall perimeter and control joint systems

LF

Patching and repair allowance

SFRM patching after MEP hangers, deck penetrations and steel modifications by following trades

SF / LSPercentage of applied area by project type and sequence

Overspray protection and masking

Poly, tape, masking of glazing, finishes and equipment, and cleanup of overspray

SF / HRS
Multi-story building wrapped in scaffolding under a blue sky

Bonding agent, primer and sealer

Bonding adhesive on deck, metal lath where required, primer under intumescent, topcoat and sealer

SF / GAL

Access, scaffold and lift time

Scissor and boom lift days, rolling scaffold and mast climbers by floor height and area

DAYS / HRS

Thickness and density testing

Thickness gauge checks, density sampling, adhesion testing and special inspection support

EA / HRS

Overview

How fireproofing quantities are actually derived

Spray-applied fire-resistive material is not measured by floor area. It is measured by the surface area of each structural member multiplied by the thickness the governing UL design requires for the rating on the fire-resistance schedule. We list every beam, girder, column, joist and deck span from the structural framing plans by section size, compute surface area per linear foot from the steel tables, and read the required thickness from the UL design for that member's W/D ratio. Columns at 3 hours, beams at 2 hours and roof deck at 1 hour all land in different rows with different thicknesses, and the material total is in board feet of applied product, not square feet of plan.

Intumescent coatings follow the same logic with a different unit. Exposed columns, moment frames, canopies and feature trusses are listed by member with their W/D ratio, and the dry film thickness in mils comes from the manufacturer's tested design for that ratio and rating. Primer compatibility, topcoat, masking of adjacent finishes and the number of coats drive the labor far more than the square footage does. Board systems such as gypsum or calcium silicate enclosures are measured as square feet of board by number of layers, with framing, fasteners and joint treatment, and are typically used where SFRM would be damaged or where the architect wants a crisp finished column.

Firestopping is a count, not an area. Every pipe, conduit, duct, cable tray and bus duct that passes through a rated wall or floor is a penetration that needs a tested system, and the price depends on the penetrant, the assembly and the annular space. We overlay the MEP sheets on the life safety plan to count penetrations by type, measure head-of-wall and perimeter edge-of-slab joints in linear feet, and separate through-penetrations from membrane penetrations. A patching allowance is carried for SFRM damaged by following trades, and overspray protection, scaffold or lift time and bonding agent for deck are listed so the number holds after the steel is topped out.

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 01

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 02

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 03

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 04

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Estimate types

What type of fireproofing estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

01

Plan-and-spec fireproofing bid

Complete SFRM, intumescent, board and firestopping pricing from the structural set, fire-resistance schedule and cited UL designs, organized by floor and rating.

Accuracy
±5%
Turnaround
48 hours
02

Structural steel fireproofing budget

An early number from the framing plans and member schedule before the fire-resistance schedule is final, using assumed ratings by occupancy and construction type.

Accuracy
±10%
Turnaround
24–48 hours
03

Intumescent exposed-steel estimate

Exposed columns, canopies and feature structure listed by W/D ratio with mil thickness, coats, primer, topcoat and finish-grade masking priced for architectural visibility.

Accuracy
±6%
Turnaround
48 hours
04

Firestopping-only takeoff

Penetrations counted by type, size and assembly with head-of-wall and perimeter joints in linear feet, matched to tested systems without SFRM scope.

Accuracy
±5%
Turnaround
24 hours
05

Patch, repair and re-rating pricing

Pricing for SFRM damaged during fit-out, retrofit of unrated steel in tenant improvements and re-rating after occupancy changes, with access and masking.

Accuracy
±8%
Turnaround
Same day to 24 hours

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

Every protected member listed by section size with its W/D ratio

so thickness comes from the UL design and not a guess.

SFRM totaled in board feet of applied product

And converted to bags by manufacturer yield, with waste and overspray loss.

Intumescent priced by dry mil thickness and coat count per member

with primer compatibility and topcoat called out.

Firestopping counted by penetration type

From an MEP overlay on the life safety plan, matched to tested system categories.

Patching allowances carried by project sequence

since SFRM applied before MEP rough-in is always damaged by it.

Access time estimated from floor-to-floor heights and congestion

with lift and scaffold rental on separate lines.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

.xlsx

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

.pdf

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

.xlsx

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

.xlsx

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

.pdf

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

.pdf

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

“We were turning down bids because our two in-house estimators were buried. LEEDS gave us division-by-division numbers in 48 hours that leveled cleanly against our sub quotes. We bid 40% more work last quarter and our hit rate went up, not down.”

Marcus Whitfield

Chief Estimator, Whitfield Commercial Builders · Charlotte, NC

CSI divisions

CSI MasterFormat divisions we cover

Estimates are organized by division so they drop straight into your cost codes and schedule of values.

03Concrete
04Masonry
05Metals
06Wood, Plastics & Composites
07Thermal & Moisture Protection
08Openings
09Finishes
22Plumbing
23HVAC
26Electrical
31Earthwork
32Exterior Improvements

Highlighted divisions are the primary scope on this page.

FAQ

Fireproofing Estimating FAQs

Straight answers on scope, turnaround, pricing and deliverables.

How do you determine SFRM thickness for each member?

We start with the fire-resistance schedule and the UL designs cited on the structural or architectural general notes. For each beam and column we compute the W/D ratio from the section size, then read the thickness the UL design requires at that ratio for the specified rating. Where the drawings cite only a rating and no design, we select a common design, state it in the assumptions and price it as a basis of bid.

Do you quantify fireproofing in square feet or board feet?

Both appear in the workbook. Surface area in square feet is what the crew sprays and what inspectors measure; board feet, which is square feet times thickness in inches, is what determines how many bags you buy. We convert board feet to bags using the manufacturer's published yield for the product and density specified, with a loss factor for overspray and rebound.

How is intumescent coating priced differently from SFRM?

Intumescent is priced per square foot of steel at a dry film thickness in mils that depends on the member's W/D ratio, the rating and the manufacturer's tested design. Labor is driven by the number of coats, primer and topcoat requirements, masking of adjacent finishes and the finish quality expected on exposed architectural steel, so it is often several times the cost of SFRM per square foot.

How do you count firestopping penetrations without a firestop schedule?

We overlay the mechanical, plumbing, electrical and fire protection sheets on the life safety plan and count every penetrant that crosses a rated wall or floor, grouped by type and size: metallic pipe, plastic pipe, insulated pipe, conduit, cable bundles, ducts and bus duct. Each group is matched to a tested system category and priced per penetration, with head-of-wall and perimeter joints measured separately in linear feet.

What patching allowance do you carry for damaged fireproofing?

It depends on sequence. When SFRM is applied before MEP rough-in, hangers, deck penetrations and welded attachments will remove material, and we carry a patching allowance as a percentage of applied area that reflects the trade density on the project. When the schedule allows fireproofing after rough-in, the allowance drops. Either way it is a visible line you can adjust, not a buried contingency.

How quickly can you turn around a fireproofing estimate?

Most structural sets up to a few hundred thousand square feet of steel-framed floor area are returned within 48 hours. High-rise towers and projects with mixed SFRM, intumescent and board systems are scheduled individually, usually three to four working days. Firestopping-only takeoffs and patch pricing for tenant improvements are typically same day or next morning.

Ready for a fireproofing estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.