Baghouses and dust collectors
Pulse-jet and cartridge units by ACFM, air-to-cloth ratio, hoppers and bag counts
New clients save 30% on their first estimate
Claim the offer
Division 44 environmental equipment
A baghouse purchase order is a fraction of the installed cost. Foundations, platforms, ducting to the stack, insulation, compressed air, instrumentation, electrical feeds and a crane lift come on top. We price pollution control projects from the process data and equipment datasheets, then quantify every interface so plant managers, EPC firms and contractors can see the full installed number before committing to a permit-driven schedule.
Overview
Division 44 covers equipment that captures, treats or destroys airborne and waterborne pollutants.
Air systems include baghouses, cartridge collectors, wet and dry scrubbers, cyclones, electrostatic precipitators and thermal or catalytic oxidizers. Water systems include equalization tanks, clarifiers, dissolved air flotation, filtration and sludge handling. Equipment is usually specified by performance: airflow in ACFM, particulate loading, removal efficiency and discharge limits.
That performance basis makes the estimate depend on vendor input. We use the process data sheet to establish equipment size, request or apply budget pricing, and then quantify what the vendor excludes. Typical exclusions include concrete pads and pilings, structural steel supports and stair towers, ductwork and expansion joints, fans and dampers, stack extensions, insulation and lagging, process piping and electrical gear.
Installation labor is driven by weight, access and lift. We estimate crane tonnage and duration, field assembly of modular sections, welding of duct and stack, and hours for alignment, leak testing and instrumentation loops. Commissioning, source testing for permit compliance and operator training are carried as separate lines so the schedule reflects the regulator's deadline.
Scope of takeoff
Equipment is sized from process data, then every installation interface is counted from mechanical, structural and electrical sheets.
Scroll through all 12 line items
On site and on the drawings
Tap any image to open it full screen.
Process
Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.
Step 1
Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.
Step 2
Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.
Step 3
Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.
Step 4
A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.
Estimate types
Match the estimate to where your project is. Every option is priced as a flat fee before work begins.
Order-of-magnitude pricing from airflow and process data, using recent vendor ranges and installed cost factors for major equipment types.
Equipment priced from vendor budget quotes, plus ductwork, supports, foundations, electrical and rigging quantified from preliminary drawings.
Full takeoff of installation scope by discipline with labor hours for erection, welding, piping, insulation, electrical and instrument loops.
Work inside an operating plant, with outage windows, hot work, demolition of existing collectors and tie-ins to existing ducts and stacks.
Why LEEDS
An estimating desk that behaves like an extension of your team, not a software subscription.

Performance-spec equipment is sized from airflow, loading and efficiency, then compared against vendor budgets for reasonableness.
Foundations, platforms, ducts, stack sections, and insulation are quantified separately, since vendors seldom include them.
Rigging is priced from equipment weights, crane radius and access conditions rather than a flat percentage.
Welding and fabrication labor is estimated, by pound of duct and by linear foot of stack for carbon and stainless materials.

Instrument loops, PLC integration and electrical, feeds are counted so process controls are not left as owner allowances.
Permit-driven testing and startup are included, which protects compliance deadlines and schedule assumptions.
Experience with both air and water treatment, equipment keeps combined plant projects in one estimate.
Deliverables
Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.
Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.
Color-coded takeoff drawings showing exactly where every measured quantity came from.
Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.
Crew-based labor hours and productivity rates so you can check the schedule against the estimate.
Every clarification, allowance and exclusion documented so your proposal scope is defensible.
A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.
Reviews
What general contractors, subcontractors and developers say after bidding with our numbers.
“Squares, underlayment, flashing lengths, fastener counts, even the ridge vent. The waste factors were right for the roof pitch. Bid-ready out of the box.”
Greg Lindqvist
Estimator, Summit Roofing Co. · Kansas City, MO
“Duct takeoff by gauge and size, equipment schedules, hangers, insulation. They understand sheet metal. Turnaround was 36 hours on a 90,000 square foot clinic.”
Tom Beaulieu
President, Beaulieu Mechanical · Minneapolis, MN
“Change-order pricing came back the same day with quantities tied to the original contract set. The owner approved without a single question.”
Rob Castellano
Senior PM, Castellano Construction Management · Newark, NJ
FAQ
We start with the process data: airflow, temperature, particulate or pollutant loading and required removal efficiency. That sets the equipment size. We then apply vendor budget pricing and add the installation scope the vendor excludes, noting each assumption so the final quote can be matched line by line.
Foundation or pad, support steel, access platforms, inlet and outlet ductwork, fans, dampers, insulation, compressed air, instrumentation, electrical feeds, rigging and startup are all quantified. Our scope matrix lists what the vendor supplies and what the contractor must furnish.
Yes. We price tanks, clarifiers, dissolved air flotation, filtration, pumps, chemical feed skids, process piping, and the concrete and electrical work that supports them. Equipment is sized from flow in gallons per minute and the treatment train shown on the process flow diagram.
We use equipment weights, pick radius, site access and number of lifts to select crane capacity and duration. Modular sections, stacks and rooftop equipment each get a lift line, so rigging cost follows the sequence of installation rather than a lump-sum percentage.
Startup, leak testing and stack testing allowances are included when the specification requires them. Permit applications and engineering fees are not part of the estimate unless requested, but we identify the compliance milestones that control the installation schedule.
Yes. We account for outage windows, hot work permits, limited laydown, shift premiums, demolition of existing equipment and tie-ins to live ductwork. These conditions change productivity, so they are carried as explicit adjustments in the labor build-up.