New clients save 30% on their first estimate

Claim the offer

Pools and spas

Swimming pool estimates built from the excavation up to the last coping stone

Pool bids go wrong underground. Rock hits, dewatering, haul-off of spoil and overdig behind steep walls can double an excavation line, while a missed spa spillway or negative-edge trough adds days of steel and plumbing. Our estimators measure the shell volume, steel schedule, plumbing runs, finishes and decking from your plan, and flag the site conditions that need an allowance before you sign.

Gunite and shotcreteSpa and water featuresAutomation and equipment
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch

CSI divisions in this scope

  • 03Concrete
  • 13Special Construction
  • 22Plumbing
  • 26Electrical
  • 31Earthwork
  • 32Exterior Improvements
  • 33Utilities

Organized by MasterFormat so it drops into your cost codes

±6%

typical variance to final cost on gunite pool estimates

24–48 hours

Typical turnaround

03 · 13 · 22 · 26

CSI divisions

XLSX · PDF

You receive

Scope of takeoff

Pool scope we quantify

Each pool is measured by shell volume, surface area and perimeter, then priced by phase so progress payments match real costs.

Scroll through all 12 line items

Excavation and spoil haul-off

Shell dig, overdig, rock or dewatering allowance, access equipment and hauling

CYPool plan, depth profile and soil report

Rebar and steel cage

Primary mat, bond beam, spa and bench steel with chairs and tie wire

LBS / LFStructural pool plan and steel schedule

Shotcrete or gunite shell

Floor, walls, steps, benches and spa with rebound loss factored into volume

CYShell geometry and wall thickness

Plumbing and circulation

Main drains, skimmers, returns, suction and pressure lines, valves and water features

LF / EAPlumbing layout and fixture schedule

Equipment pad and mechanical

Pump, filter, heater, chlorinator, cleaner and pad with enclosure or screening

EA / SFEquipment schedule and hydraulic sizing

Electrical, lighting and bonding

Subpanel, GFCI, LED lights, equipotential bonding grid and conduit to the pad

EA / LFElectrical sheet and NEC Article 680

Waterline tile and coping

Glass or porcelain tile band, bullnose or cantilever coping, and expansion joints

LFPool perimeter measurement

Interior finish

Plaster, quartz or pebble aggregate with start-up and chemical balancing

SFWetted surface area calculation

Decking and hardscape

Poured concrete, pavers, travertine or stamped deck with drains and slope

SFSite plan and deck material schedule

Spa and water features

Raised spa, spillway, sheer descents, deck jets, bubblers and fire bowls

EA / LSFeature details and plumbing sizing

Fencing, gates and barriers

Code barrier, self-latching gates, alarms and safety covers

LF / EASite plan and local pool barrier code

Automation, heating and permits

Control systems, heat pump or gas heater, plan review and inspection fees

EA / LSOwner selections and jurisdiction fee table

Estimate types

What type of swimming pool estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Estimate typeAccuracyTurnaroundBest for

Budget range by pool type

A pricing range for gunite, shotcrete, vinyl or fiberglass shells, based on surface area, depth and finish level.

±12-15%Same dayHomeowners and designers at concept stage

Detailed construction estimate

Full quantity takeoff for excavation, shell, plumbing, equipment, finishes and decking from permit drawings.

±5-7%24-48 hoursPool builders issuing fixed-price contracts

Resort and commercial pool estimate

Pricing for larger vessels with commercial filtration, ADA lifts, deck drains and health department requirements.

±6-8%72 hoursHotels, HOAs and recreation centers

Site-condition allowance review

Evaluation of soil, rock, groundwater and access risks with ranged allowances before the bid goes out.

Allowance range24 hoursBuilders pricing difficult lots

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  • Excavation is calculated from the depth profile and includes overdig, haul-off and an allowance for rock or groundwater.
  • Shotcrete volume carries a rebound and overspray factor, which is the common reason shell concrete runs over budget.
  • Tile, coping and plaster are quantified from perimeter and wetted surface area, not rounded from the pool length and width.
  • Plumbing is sized to turnover requirements, so equipment lists match the actual hydraulic demand of the water features.
  • Spas, spillways, sheer descents and fire features are priced as individual components with their own steel and plumbing.
  • Deck estimates distinguish between poured concrete, pavers, travertine and stamped overlays, with drainage and slope included.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

XLSX

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

PDF

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

XLSX

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

XLSX

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

PDF

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

PDF

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Tools

Estimating software and cost data we work in

Deliverables fit the tools your team already uses.

BR

Bluebeam Revu

Calibrated PDF markup and measurement

P

PlanSwift

Digital takeoff and assemblies

RD

RSMeans Data

Localized unit cost database

ME

Microsoft Excel

Deliverables formatted to your template

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Clutch
“Change-order pricing came back the same day with quantities tied to the original contract set. The owner approved without a single question.”

Rob Castellano

Senior PM, Castellano Construction Management · Newark, NJ

Trustpilot
“The conduit and wire takeoff matched what my foreman pulled from the drawings almost to the foot. Labor hours were realistic for our crews. It is the first outsourced estimate I did not have to redo.”

Dana Okafor

Owner, Okafor Electric · Houston, TX

Google
“Washington energy code and seismic detailing were reflected in the pricing without us having to explain anything. That is rare for an out-of-state estimator.”

Kim Nakamura

Co-founder, Pacific Build Collective · Seattle, WA

Overview

What a pool estimate has to capture

A swimming pool is a structural concrete vessel with a mechanical plant attached. The estimate has to follow both. The shell begins with excavation measured in cubic yards, includes overdig for plumbing and form access, and carries spoil haul-off and any rock, groundwater or access-equipment premium. Steel is scheduled per bar and ring beam, then shotcrete or gunite is calculated in cubic yards with a rebound factor so the first pour does not come up short. Soil reports and local water tables are reviewed during takeoff, so dewatering and hydrostatic relief valves are priced before they become an emergency.

The plant comes next: main drains, skimmers, return lines, pump, filter, heater, chlorinator, lighting, automation and bonding, all rated against the pool volume and turnover requirements. Tile, coping and plaster are quantified by linear foot and square foot, and the deck is measured by material, whether poured concrete, travertine pavers or stamped overlay, with the drainage and slope that keep water away from the house. Each equipment item is matched to the pool volume and plumbing size, which avoids undersized pumps and the change orders that come with them.

Around the pool are code items homeowners rarely budget for: barrier fencing and self-closing gates, GFCI protection, equipotential bonding, safety covers and electrical to the equipment pad. We include them, with permit and inspection fees for the pool and any associated structure, so the contract price reflects everything required to pass final inspection and fill the pool legally. Many owners also add landscape lighting, pergolas or outdoor kitchens, so we price them as separate options that do not distort the pool shell budget.

FAQ

Swimming Pool Estimating FAQs

Straight answers on scope, turnaround, pricing and deliverables.

What is the biggest cost risk in a swimming pool estimate?

Excavation. Rock, high groundwater, poor soils and limited machine access can raise the dig and haul-off cost sharply. We estimate the base excavation by cubic yard, then include an allowance range tied to your soil report, so the risk is visible in the bid and not a surprise on the first day.

How do you calculate shotcrete or gunite quantities?

We build the shell geometry from the plan, including floor, walls, benches, steps and spa, multiply by thickness and add a rebound and overspray factor. The result is in cubic yards, with separate lines for the bond beam and any raised walls or water feature structures.

Do you estimate plumbing and equipment for the pool?

Yes. We quantify main drains, skimmers, returns, valves and pipe runs in linear feet, then list pump, filter, heater, chlorinator, lighting and automation from the equipment schedule. We size to the pool volume and turnover rate so the pad design and price are consistent, and variable-speed pump options are shown as upgrades.

Can you price decking and hardscape around the pool?

Yes. We measure deck area in square feet by material, add forms, base, reinforcement, expansion joints, drains and slope, and include coping transitions. If the plan shows outdoor kitchens, walls or fire features, we price those as separate lines. We also note which deck materials need an engineered base over backfilled soil.

Does the estimate include pool barriers and electrical code items?

It does. Fencing, self-closing and self-latching gates, door alarms, equipotential bonding, GFCI protection and wiring to the pad are quantified according to your local code and NEC Article 680. We also include permit and inspection fees for the pool and any barrier work. The totals are broken out so you can see required safety cost versus optional upgrades.

Can you estimate pool remodels and replasters?

Yes. A remodel estimate covers draining, acid wash or chip-out, crack repair, new tile and coping, plaster or aggregate finish, plumbing repairs and equipment upgrades. We quantify by surface area and linear foot, with allowances for hidden shell damage noted at demolition. Equipment upgrades such as variable-speed pumps are shown as separate options.

Ready for a swimming pool estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.