New clients save 30% on their first estimate

Claim the offer

Division 06 · Architectural Woodwork

Millwork estimates that separate the cabinet box from the shop drawing hours behind it

Millwork pricing swings on grade, species and finish far more than on lineal footage. A premium-grade quartered white oak reception desk and a standard-grade laminate base cabinet can share a line on the plans and differ by a factor of five. We read the architectural woodwork specification, quantify casework, trim, doors and stair parts, and price each by AWI grade, material and finish system.

Custom traditional kitchen cabinetry with carved detailing and an island

3AWI quality grades priced separately: economy, custom and premium

AWI grade-based pricingShop drawing hours includedFinish system breakouts
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch

Overview

Where millwork cost really comes from

Millwork is priced in layers. The first is geometry: base cabinets, wall cabinets and tall units taken off in linear feet from interior elevations, plus countertops in square feet, trim in linear feet by profile and doors in each. The second is the specification, which sets the AWI grade, face veneer, edge treatment, hardware class and construction method, such as frameless European-style or face-frame with inset doors.

The third layer is what drawings never show: shop drawing production and submittal revisions, field measurement of existing walls, finish sampling, crating and protection, and installation sequencing around drywall, flooring and paint. On custom projects those hours can exceed material cost on a feature wall.

We carry all three layers in the estimate, so a contractor bidding architectural woodwork sees cost per linear foot by casework type, plus separate lines for engineering, finishing and install. That is how a millwork shop protects margin when elevations change after award.

Scope of takeoff

Millwork items we quantify

Quantities come from interior elevations, casework schedules and finish legends, then are tied to the AWI grade called out in Section 06 40 00.

#ItemUnit
  • 01Base cabinetsFrameless and face-frame boxes with drawers, doors, adjustable shelves and toe kicksLF
  • 02Wall cabinetsStandard and tall wall units, glass-door cabinets and crown or light railLF
  • 03Tall and pantry unitsFull-height storage, appliance garages and oven towersEA
  • 04Countertops and surfacesHigh-pressure laminate, solid surface, quartz and butcher block with backsplashes and cutoutsSF
  • 05Trim, base and casingBaseboard, door and window casing, chair rail, crown and picture molding by profileLF
  • 06Wood doors and framesStile-and-rail, flush veneer and fire-rated doors with jambs and thresholdsEA
  • 07Paneling and wall claddingVeneer panels, slatted acoustic wood walls and wainscot with reveal detailsSF
  • 08Stair parts and railingsTreads, risers, newels, balusters, handrails and volutesEA / LF
  • 09Built-ins and reception desksCustom feature units, shelving walls, lockers and fixtures with integrated hardwareEA / LS
  • 10Hardware and accessoriesHinges, drawer slides, pulls, grommets, shelf pins and cabinet locksEA
  • 11FinishingStain, catalyzed lacquer, conversion varnish and paint-grade prep by exposed SFSF
  • 12Shop drawings and installationEngineering, field measure, delivery, installation and punch-list laborHRS

Estimate types

What type of millwork estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Architectural woodwork bid

Complete Section 06 40 00 pricing with casework, trim, panels and doors grouped by room, finish system and AWI grade, ready for a bid form or alternates.

Accuracy

±6%

Turnaround

48 hours

Best for

Millwork shops and woodwork subcontractors

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

XLSX

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

PDF

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

XLSX

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

XLSX

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

PDF

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

PDF

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

Architectural blueprints laid out with drafting pencils, a metal ruler and a drawing tube
  • Estimators who read Section 06 40 00 and, know how premium versus custom grade changes joinery, matching and tolerance.

  • Casework priced by type, not as a blanket price per foot, so tall units, sink bases and drawer stacks carry their real cost.

  • Shop drawing, submittal and field measurement, hours separated from fabrication, so redesigns have a visible price.

  • Veneer, species and grain matching called, out as selection decisions, with cost deltas for each choice.

Yellow tower crane rising above scaffolding against a clear blue sky
  • Countertop fabrication and cutouts, edges, backsplashes and sink or cooktop reinforcement captured per piece.

  • Finishing priced by exposed SF and system, since catalyzed varnish costs more than a clear lacquer.

  • Delivery, protection and installation sequencing, carried as separate lines for multi-floor projects.

  • Quantities and unit costs organized by room, so a tenant or owner can approve or delete areas independently.

CSI divisions

CSI MasterFormat divisions we cover

Estimates are organized by division so they drop straight into your cost codes and schedule of values.

01General Requirements
02Existing Conditions
03Concrete
04Masonry
05Metals
06Wood, Plastics & Composites
07Thermal & Moisture Protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
21Fire Suppression
22Plumbing
23HVAC
25Integrated Automation
26Electrical
27Communications
28Electronic Safety & Security
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
35Waterway & Marine Construction
40Process Interconnections
41Material Processing & Handling
44Pollution & Waste Control Equipment
48Electrical Power Generation

Highlighted divisions are the primary scope on this page.

Project types

Project types we estimate

The same measured-twice standard applies whether the scope is a tenant improvement or a ground-up campus.

Corporate offices and reception areas
Law firms and financial services interiors
Hotels and hospitality lobbies
Luxury residential kitchens and libraries
Healthcare nurse stations and casework
Retail store fixtures and displays
Universities and library millwork
Restaurants, bars and tasting rooms

FAQ

Millwork Estimating FAQs

How do AWI grades change the price?

Economy, custom and premium grades set tolerances for joinery, veneer matching, edge treatment and finish quality. Premium work can cost 40 to 80 percent more than custom for the same layout because of material selection and shop time. We price the grade written in the specification and can show alternates.

Do you include shop drawings in the millwork estimate?

Yes. Shop drawing production, submittal revision cycles and field measurement are carried as their own hours line, separate from fabrication. That makes it easy to see what a design change after award will cost your shop.

Can you price millwork from design intent drawings?

We can. For early documents we build a unit-cost model using linear feet of casework by type, a grade assumption and a finish allowance, and document every assumption so it can be tightened when elevations and the casework schedule are complete.

Are countertops and hardware included?

Countertops are measured in square feet with edge profile, cutouts and backsplash. Hinges, slides, pulls and accessories are counted from cabinet quantities and the hardware schedule, so they appear as units and not as a lump percentage.

Do you price prefinished or site-finished trim?

Either. We compare prefinished stock against site-applied paint or stain, including the extra labor of caulking, sanding and multiple coats on site. Many builders find that prefinished runs more in material but saves enough field time to break even.

How long does a millwork estimate take?

Residential trim and kitchen packages are often delivered in 24 hours. Commercial architectural woodwork with many elevations and custom pieces typically takes 48 hours, and we confirm the date once we have reviewed the specification.

Ready for a millwork estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.