Openings estimated door by door, from frame to hardware set

A door is never just a door. It is a frame in a specific gauge and profile, a leaf with a fire label, a hardware set with hinges, closer, lockset and a threshold, and sometimes an electrified strike that nobody on the bid team priced. Our estimators reconcile door schedules with plans, count every opening, price hardware by set, and measure glazed systems by square foot of vision area.

Hardware sets itemizedFire labels trackedGlazing by SF and lite size
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Open window with construction happening outside

Specification sheet

CSI divisions
08 Openings · 07 Thermal & Moisture Protection (sealants)
Schedules reconciled
Door, frame, hardware, window and glazing types
Turnaround
24–48 hours (rush available)
Deliverables
Excel workbook, color-coded plans, opening-by-opening list
Standards referenced
NFPA 80 labels, ANSI/BHMA grades, SDI frames, AAMA and NFRC ratings
Project sizes
Tenant suites to 400-opening hospital towers
100%of schedule openings reconciled to plan tags before pricing

Scope of takeoff

Openings quantities we take off

Every opening is counted, tagged and priced as a complete assembly of leaf, frame, glass and hardware.

#ItemUnit
  • 01Hollow metal doors and frames16 and 18 gauge steel doors, welded and knock-down frames, borrowed lites and fire-rated labelsEA
  • 02Wood and plastic laminate doorsSolid core, flush and stile-and-rail doors in veneer or laminate, with pre-hung and site-hung optionsEA
  • 03Aluminum entrances and storefrontFramed storefront, swing and sliding entrances, and automatic operatorsSF / EA
  • 04Curtain wall and window wallStick and unitized systems with vision glass, spandrel panels and anchors to slab edgeSF
  • 05Windows by typeFixed, casement, double-hung, awning and slider units in aluminum, vinyl, wood or fiberglassEA
  • 06Glass and glazingInsulated, laminated, tempered and low-E units by lite size, plus fire-rated glass in rated openingsSF
  • 07Finish hardware setsHinges, closers, locksets, exit devices, stops, kickplates and thresholds per hardware setSET / EA
  • 08Specialty doorsOverhead coiling, sectional, sliding fire doors, revolving doors and security grillesEA
  • 09Access doors and hatchesRoof hatches, ceiling and wall access panels and smoke ventsEA
  • 10Sealants and weatherstrippingPerimeter sealant, backer rod, gasketing, flashing and interior firestopping at rated framesLF
  • 11Electrified and access control hardwareElectric strikes, mortise locks, door position switches, card readers and power suppliesEA
  • 12Installation laborFrame setting, door hanging, glazing and hardware install by opening type and floorHRS

CSI divisions

CSI MasterFormat divisions we cover

Estimates are organized by division so they drop straight into your cost codes and schedule of values.

01General Requirements
02Existing Conditions
03Concrete
04Masonry
05Metals
06Wood, Plastics & Composites
07Thermal & Moisture Protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
21Fire Suppression
22Plumbing
23HVAC
25Integrated Automation
26Electrical
27Communications
28Electronic Safety & Security
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
35Waterway & Marine Construction
40Process Interconnections
41Material Processing & Handling
44Pollution & Waste Control Equipment
48Electrical Power Generation

Highlighted divisions are the primary scope on this page.

Overview

How an openings estimate gets built

Openings pricing begins with the door schedule, but the schedule is only a starting point. We count every door tag on the plans, compare it with the schedule, and flag the mismatches: the corridor door that appears on three sheets with different frame types, the pair that the schedule lists as single. Each opening is carried by door material, frame type, fire rating, glazing kit and hardware set number.

Hardware is priced by set rather than by piece. Hinges, closers, locksets, exit devices, stops, thresholds, gasketing and electrified components come from the hardware schedule and are checked against ANSI/BHMA grade requirements and fire-label rules. Access control scope is separated so you can carry it with security.

Glazed systems are measured from the elevations: storefront and curtain wall by square foot with mullion footage, windows by type and size, and glass by lite dimension and coating. Sealants, flashing and installation labor are added by perimeter, with lift and crane time for large lites.

Estimate types

What type of openings estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Door, frame and hardware package

Complete Division 08 interior openings with every leaf, frame, glazing kit and hardware set carried by door tag and installation labor.

Accuracy

±4%

Turnaround

48 hours

Best for

Door and hardware suppliers and installers

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

  • Estimate workbookXLSX

    Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

  • Marked-up plansPDF

    Color-coded takeoff drawings showing exactly where every measured quantity came from.

  • Material procurement listXLSX

    Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

  • Labor hours by taskXLSX

    Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

  • Assumptions and exclusions logPDF

    Every clarification, allowance and exclusion documented so your proposal scope is defensible.

  • Bid summary sheetPDF

    A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  1. 01

    Door schedules reconciled against plan tags, so conflicts between sheets are flagged before they become change orders.

  2. 02

    Hardware priced by set number with function, finish and ANSI/BHMA grade, not by an allowance per door.

  3. 03

    Fire labels and rated frames tracked per opening so 20, 45 and 90 minute doors are never priced as non-rated leaves.

  4. 04

    Storefront and curtain wall measured from elevations in square feet, with mullion footage and anchor counts from sections.

  5. 05

    Glass quantities carried by lite size, thickness and coating, with large lites flagged for crane or lift time.

  6. 06

    Electrified hardware and access control broken, out so security and electrical scopes are not duplicated or dropped.

  7. 07

    Sealants, flashing and interior firestopping, included for each opening perimeter.

  8. 08

    Opening-by-opening output your supplier can, use as a submittal checklist.

5,000+Projects estimated
24–48hTypical turnaround
40+Trade categories
98%Takeoff accuracy

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Google
“We were turning down bids because our two in-house estimators were buried. LEEDS gave us division-by-division numbers in 48 hours that leveled cleanly against our sub quotes. We bid 40% more work last quarter and our hit rate went up, not down.”

Marcus Whitfield

Chief Estimator, Whitfield Commercial Builders · Charlotte, NC

Google
“Lumber lists, finish schedules and allowances in a format our clients actually understand. The assumptions log alone has saved us from two scope disputes.”

Luis Herrera

Project Manager, Sierra Ridge Homes · Phoenix, AZ

Google
“I used to lose a whole weekend to takeoffs. Now I upload on Friday and have board counts, mud and tape, and paint gallons by Monday morning.”

Elena Vasquez

Owner, Vasquez Drywall & Paint · San Antonio, TX

FAQ

Openings Estimating FAQs

How do you price door hardware?

Hardware is priced by hardware set from the architect's schedule, with each hinge, closer, lockset, exit device, stop and threshold counted per opening. We note the function, finish and grade, and we mark any set that contains electrified components so you can cross-check against access control.

Do you reconcile the door schedule with the floor plans?

Always. We count door tags on the plans, compare them with the schedule, and list mismatches such as missing tags, wrong frame types or pairs listed as singles. Resolving these early prevents surprises after the submittal stage.

How are storefront and curtain wall quantified?

From the building elevations, we measure area by system type, then count verticals and horizontals from sections to produce mullion footage. Glass is carried separately by lite size and coating, and anchors, sealants and lift or crane time are added by elevation.

Can you estimate window replacement for multifamily projects?

Yes. We count windows by type and size from the schedule or site survey, then price removal, new units, flashing, interior trim and sealant. Unit-type repetition lets us model hundreds of windows quickly and still preserve the per-unit detail you need.

Do your estimates include fire-rated openings?

Rated doors, frames, glazing and hardware are tracked per opening. We reference NFPA 80 requirements for labeled assemblies and carry the price difference for rated leaves, fire-rated glass, closers and gasketing so no corridor door is bid as a standard unit.

Is installation labor included or just materials?

Both are available. A full estimate carries installation hours by opening type and floor, with extra time for heavy glass and rated assemblies. If you only need a supply quantity list for a distributor quote, we deliver that without labor.

Ready for a openings estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.