New clients save 30% on their first estimate

Claim the offer

Mission-critical facilities

Data center estimates built around kilowatts, racks and redundancy

A data center is a power and cooling plant with a building wrapped around it. Most of the cost sits in switchgear, generators, UPS modules, chillers and the miles of cable that tie them together, and every one of those systems has to be sized against the IT load and the redundancy the owner has chosen. LEEDS prices the facility system by system, from the utility service to the last patch cord, and shows what each redundancy level adds so the budget can be defended line by line.

Tier II–IV scopePower, cooling and cabling in one workbookCommissioning labor included
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Rows of dark server cabinets with cabled network equipment and glowing status lights in a data center
Two contractors in white hard hats inspecting plans together on a construction site
Architectural blueprints laid out with drafting pencils, a metal ruler and a drawing tube
N+1 to 2N

redundancy priced as separate options on every electrical and cooling line

BR Bluebeam Revu
RD RSMeans Data
TA Trimble Accubid
P Procore
ME Microsoft Excel

Scope of takeoff

Data center scope we quantify

Every system is counted from single-line diagrams, mechanical schedules, white space layouts and the basis of design, then reconciled against the IT load.

Utility service and switchgear

Medium-voltage service entrance, transformers, main and distribution switchgear, automatic transfer switches

EASingle-line diagram and switchgear schedule

Standby generators and fuel

Generators by kW rating, paralleling gear, day tanks, bulk fuel storage, exhaust and enclosures

EA / GAL

UPS systems and batteries

UPS modules, static bypass cabinets, VRLA or lithium battery strings and battery monitoring

kW / EA
Aerial view of a crew in high-visibility vests screeding and finishing a fresh concrete slab

Power distribution

PDUs, remote power panels, busway runs with tap-off units, whips and metered rack PDUs

EA / LF

Racks, cabinets and containment

Server cabinets, hot and cold aisle containment, end-of-row doors, blanking panels and seismic bracing

EA / LF

Cooling plant

Chillers, cooling towers, pumps, chilled water piping, insulation and economizer equipment

EA / TON / LF

White space air handling

CRAH and CRAC units, in-row coolers, rear-door heat exchangers, humidifiers and condensate piping

EA

Raised floor and cable tray

Raised access floor, perforated tiles, overhead basket tray, ladder rack and fiber duct

SF / LFArchitectural and communications plans

Structured cabling and fiber

Copper and fiber trunks, MPO cassettes, patch panels, patch cords and meet-me room terminations

LF / EA
Hands typing on a laptop displaying a cost spreadsheet in an open office

Fire detection and suppression

Aspirating smoke detection, clean agent cylinders, nozzles and piping, pre-action sprinkler systems

EA / LF

Security and access

Mantraps, biometric and card readers, cage access, cameras and visitor management

EA

Monitoring, BMS and DCIM

Branch circuit monitoring, leak detection, temperature and humidity sensors, DCIM software and licenses

EA / PT

Testing and commissioning

Level 1 through Level 5 commissioning, load bank rental, integrated systems testing and documentation

HRS / LS

Project types

Project types we estimate

The same measured-twice standard applies whether the scope is a tenant improvement or a ground-up campus.

Rows of dark server cabinets with cabled network equipment and glowing status lights in a data center
01

Enterprise data centers

Aerial view of a crew in high-visibility vests screeding and finishing a fresh concrete slab
02

Colocation and wholesale facilities

Hands typing on a laptop displaying a cost spreadsheet in an open office
03

Hyperscale campuses

Scale ruler resting on a set of architectural drawings
04

Edge and modular data centers

Multi-story building wrapped in scaffolding under a blue sky
05

Server rooms and network cores in office buildings

Total station on a tripod set up in front of a construction site with a tower crane
06

Healthcare and university computing facilities

Rusty rebar grid ready for a concrete pour
07

Financial trading and disaster recovery sites

Rows of dark server cabinets with cabled network equipment and glowing status lights in a data center
08

Capacity upgrades in live facilities

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

Upload plans and scope
  1. 1

    Step 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Step 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Step 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Step 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Free quote

Get a fixed quote for this scope

Upload drawings or a plan link and tell us the bid date. A senior estimator confirms scope, price and delivery before any work starts.

  • Scope confirmation and a fixed price within two business hours
  • Most estimates delivered in 24–48 hours
  • Unlimited revisions until bid day
  • Plans stay confidential and are deleted on request

Prefer to talk? Call +1 (800) 555-0199 or email info@leedsestimating.com.

Plans and documents

Drop your plans here or browse

PDF, DWG, DXF, ZIP, PNG, JPG, JPEG, WEBP, XLS, XLSX, DOC, DOCX, CSV · up to 5 files · 4.0 MB total

Plans stay confidential. Reply within 2 business hours.

By the numbers

Measured twice, delivered on time

5,000+Projects estimated
24–48hTypical turnaround
40+Trade categories
98%Takeoff accuracy

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

Aerial view of a crew in high-visibility vests screeding and finishing a fresh concrete slab
  • Equipment lists are built per redundancy level, so N, N+1 and 2N options can be compared without re-estimating the facility.

  • Generator, UPS and cooling capacities are, reconciled against the design IT load and the electrical losses between them.

  • Major equipment is priced from current vendor, budget quotes rather than historical unit costs that lag the market.

  • Cable tray, busway and fiber trunk lengths, are measured from routed plans, not estimated from a per-rack allowance.

Hands typing on a laptop displaying a cost spreadsheet in an open office
  • Commissioning, load banks and integrated, systems testing appear as their own scope with hours and durations.

  • Owner-furnished items such as servers, network gear and DCIM licenses are tracked in a separate column so they never inflate the construction number.

  • Every workbook closes with a cost per kW, summary by system so the estimate speaks the language owners and lenders use.

Estimate types

What type of data center estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

01

Cost per kW budget

Facility budget built from installed cost per kilowatt by system, adjusted for tier level, climate, site conditions and the owner's density targets.

Accuracy
±15%
Turnaround
24-48 hours
02

Hard-bid systems takeoff

Full takeoff of electrical, mechanical, cabling, fire protection and security from the construction set, with vendor quotes for major equipment and a scope matrix between trades.

Accuracy
±5-7%
Turnaround
72 hours
03

Colocation fit-out estimate

Cage, cabinet, rack PDU, cabling and containment pricing for tenant space inside an existing facility, with landlord-provided power and cooling clearly separated.

Accuracy
±8%
Turnaround
24-48 hours
04

Capacity expansion estimate

Added UPS modules, generators, cooling units and distribution for a live facility, with phasing, temporary power and after-hours labor carried as separate lines.

Accuracy
±10%
Turnaround
48-72 hours

Overview

What data center estimating covers

The electrical chain carries the largest share of cost: medium-voltage service and transformers, main switchgear, standby generators with fuel storage, uninterruptible power supplies with battery strings, power distribution units, busway and the rack-level distribution that finally feeds the servers. We count every element from the single-line diagram and the equipment schedules, then size the quantities against the design IT load and the chosen topology so that an N+1 design and a 2N design are never priced from the same equipment list.

Cooling is the second plant. Chillers, cooling towers, pumps, piping, computer room air handlers, in-row coolers, containment and economizer systems are taken off from the mechanical schedules and flow diagrams, with tonnage reconciled against the electrical load. Structured cabling and fiber backbone, raised floor and overhead tray, clean agent fire suppression, aspirating smoke detection, access control and the monitoring systems that watch all of it fill out the remaining divisions.

Data center budgets are usually judged in dollars per kilowatt, so every workbook we deliver closes with a cost per kW summary by system alongside the detailed line items. Commissioning is priced as its own scope, because Level 1 through Level 5 testing, load banks and the integrated systems test are real labor and real schedule, not a line to be absorbed in general conditions.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

XLSX

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

PDF

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

XLSX

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

XLSX

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

PDF

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

PDF

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

“We were turning down bids because our two in-house estimators were buried. LEEDS gave us division-by-division numbers in 48 hours that leveled cleanly against our sub quotes. We bid 40% more work last quarter and our hit rate went up, not down.”

Marcus Whitfield

Chief Estimator, Whitfield Commercial Builders · Charlotte, NC

CSI divisions

CSI MasterFormat divisions we cover

Estimates are organized by division so they drop straight into your cost codes and schedule of values.

03Concrete
04Masonry
05Metals
06Wood, Plastics & Composites
07Thermal & Moisture Protection
08Openings
09Finishes
21Fire Suppression
22Plumbing
23HVAC
25Integrated Automation
26Electrical
27Communications
28Electronic Safety & Security
31Earthwork
32Exterior Improvements
48Electrical Power Generation

Highlighted divisions are the primary scope on this page.

FAQ

Data Center Estimating FAQs

Straight answers on scope, turnaround, pricing and deliverables.

How do you price redundancy levels?

We build the equipment list for the base topology, then add the modules, feeders, cooling units and distribution that each higher redundancy level requires. The workbook shows N, N+1 and 2N as separate options with their cost per kW, so the owner can see exactly what each level of resilience buys.

Do you estimate the IT equipment itself?

Servers, storage, network switches and software are normally owner-furnished and are tracked in a separate column so the construction estimate stays clean. If the contract includes any of that scope, we price it from vendor quotes and label it clearly.

What documents do you need for a data center estimate?

At minimum, the single-line diagram, mechanical schedules, white space layout and the basis of design with the target IT load and redundancy. Equipment cut sheets, the commissioning specification and any vendor quotes already in hand tighten the numbers further.

Can you estimate an expansion inside a live facility?

Yes. Expansion estimates include the added UPS, generator and cooling capacity plus the phasing, temporary power, protective enclosures and after-hours labor that working next to live load requires. Those costs are carried on separate lines so they can be reviewed with the operations team.

How is commissioning handled in the estimate?

Commissioning is priced as its own scope with hours by level, load bank rental, fuel for generator testing and the integrated systems test. It is one of the most frequently underestimated costs in mission-critical work, so we never bury it in general conditions.

Do you provide cost per kilowatt benchmarks?

Every workbook closes with a cost per kW summary by system. We can also compare the result against ranges for similar tier levels and regions, with the caveat that site conditions, density and equipment lead times move those numbers materially.

Ready for a data center estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.