New clients save 30% on their first estimate

Claim the offer

Division 25 building automation

Building automation estimates built on the points list, not a rule of thumb

Controls scopes are priced by the point, but the points hide in sequences of operation, equipment schedules and integration notes. We build the list from the drawings, count controllers and field devices, and add the hours that make a system work: programming, graphics, network setup, functional testing and owner training. You get a defensible figure for the controls contractor, the mechanical sub or the general contractor carrying the allowance.

Points list takeoffProgramming hours itemizedBACnet and Modbus aware
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Quantities verified twice
1 list

of hardware and software points reconciled to every sequence of operation

24–48 hours

Typical turnaround

25 · 23 · 26 · 27

CSI divisions

XLSX · PDF

You receive

Scope of takeoff

Automation scope we quantify

Counts come from schedules, riser diagrams and sequences, then reconcile to a single points list.

#ItemUnit
  • 01Direct digital controllersUnitary, VAV and plant controllers sized by input and output point capacityEA
  • 02Hardware pointsAnalog and digital inputs and outputs by equipment type, including sparesPTS
  • 03Temperature and humidity sensorsRoom, duct, immersion and outside air sensors with wells and averaging elementsEA
  • 04Pressure, flow and CO2 sensorsDifferential pressure, airflow stations, water flow meters and demand ventilation sensorsEA
  • 05Actuators and control devicesDamper actuators, valve actuators, current switches and relaysEA
  • 06Network and head-end hardwareSupervisory controllers, routers, switches, servers and operator workstationsEA
  • 07Third-party integrationChillers, boilers, VFDs, lighting controls and power meters tied via BACnet or ModbusEA / PTS
  • 08Low-voltage wiring and conduitShielded control cable, network cable, raceway and terminationsLF
  • 09Programming and graphicsControl logic, schedules, trends, alarms, floor plan and equipment graphicsHRS
  • 10Commissioning and checkoutPoint-to-point verification, functional tests, seasonal tuning and deferred testingHRS
  • 11Training and documentationOperator training sessions, as-built drawings and operation manualsHRS / LS
  • 12Warranty and serviceSoftware licensing, cloud analytics fees and first-year supportYRS / LS

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

.xlsx

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

.pdf

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

.xlsx

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

.xlsx

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

.pdf

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

.pdf

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

What type of integrated automation estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Budget per point

±15%24 hours

Quick controls budget from equipment counts using installed cost per point ranges, adjusted for building type, integration depth and graphics expectations.

Best for: Early design budgets

Points-list estimate

±7%48 hours

Controller, device and labor pricing from a full points list built from the sequences of operation, with spare capacity and network hardware identified.

Best for: Controls and mechanical bids

Integration and retrofit estimate

±10%48-72 hours

Existing system survey allowances, gateway hardware, protocol mapping and phased cutover labor for buildings adding or replacing a front end.

Best for: Facilities and energy upgrades

Scope-gap review

n/a24 hours

Line-by-line check of who furnishes, installs, wires and powers every valve, damper, sensor and panel between mechanical, electrical and controls contractors.

Best for: General contractors

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

CSI divisions

CSI MasterFormat divisions we cover

Estimates are organized by division so they drop straight into your cost codes and schedule of values.

01General Requirements
02Existing Conditions
03Concrete
04Masonry
05Metals
06Wood, Plastics & Composites
07Thermal & Moisture Protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
21Fire Suppression
22Plumbing
23HVAC
25Integrated Automation
26Electrical
27Communications
28Electronic Safety & Security
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
35Waterway & Marine Construction
40Process Interconnections
41Material Processing & Handling
44Pollution & Waste Control Equipment
48Electrical Power Generation

Highlighted divisions are the primary scope on this page.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  • Points lists are built from the sequences of operation, which catches monitored points the equipment schedule never mentions.
  • Programming, graphics, checkout and training are carried as separate hour lines instead of being buried in a lump-sum markup.
  • We separate controls furnished by the BAS contractor from items furnished by mechanical, such as valves, wells and dampers.
  • Integration with chillers, boilers, drives, lighting controls and electric meters is priced per gateway and per protocol.
  • Network hardware is sized to the architecture diagram, including the IT department's switch and port requirements.
  • Low-voltage wiring and conduit are quantified from riser diagrams so Division 26 does not assume the controls contractor included them.

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

“The conduit and wire takeoff matched what my foreman pulled from the drawings almost to the foot. Labor hours were realistic for our crews. It is the first outsourced estimate I did not have to redo.”

Dana Okafor

Owner, Okafor Electric · Houston, TX

Overview

How an automation estimate is assembled

Integrated automation covers the building management system that monitors and controls HVAC, lighting, metering and other building systems, plus the network that ties them together. The estimator starts with the equipment schedules and sequences of operation, because every air handler, VAV box, pump, boiler and chiller creates a defined number of analog and digital inputs and outputs.

Those points roll up to direct digital controllers, expansion modules, variable frequency drive interfaces and field devices such as temperature, humidity, CO2 and differential pressure sensors, damper and valve actuators, and current switches. Network components, including routers, switches, supervisory controllers and operator workstations, are added from the architecture diagram. Wiring is counted as LF of low-voltage cable and conduit where specified.

Software and engineering time often matter more than hardware. We carry hours for point-to-point checkout, programming by sequence, graphic page development, trend setup, alarm routing, integration of third-party equipment through BACnet or Modbus gateways, commissioning, seasonal tuning and training. We also record who furnishes control valves, dampers and wells, since the mechanical contractor often installs them.

FAQ

Integrated Automation Estimating FAQs

Straight answers on scope, turnaround, pricing and deliverables.

What is the basis for a building automation estimate?

The points list. We read the equipment schedules and sequences of operation to count every input and output, then size controllers, add field devices and carry hours for programming, graphics, commissioning and training. Network and head-end hardware come from the architecture diagram.

Do you estimate programming and commissioning hours?

Yes. Programming is broken out by equipment type and sequence complexity, with separate hours for graphics, trends and alarms, point-to-point checkout, functional testing, seasonal tuning and operator training. That makes it easy to compare against an integrator's proposal.

Can you price integration with third-party equipment?

We price gateways, protocol licensing, mapping and testing for chillers, boilers, drives, metering and lighting controls over BACnet, Modbus or LonWorks. Where the spec is silent on protocol, we carry an allowance and note the assumption in the log.

Who furnishes control valves and dampers?

That is one of the most common scope gaps. Our matrix records who furnishes, installs, wires and powers each item. Typically the controls contractor furnishes and the mechanical contractor installs, but the specification governs and we follow it.

Do you include IT network requirements?

We include control network hardware shown on the drawings and note switch ports, IP addresses and firewall requirements the owner's IT group must provide. If the building uses its own network, that is flagged as an owner-furnished item to avoid double counting.

Can you estimate a retrofit of an existing BAS?

Yes. Retrofits carry survey allowances, front-end replacement, controller swaps, and phased cutover labor. We also price temporary monitoring during the transition and list unknown field conditions that the controls contractor should verify before final pricing.

Ready for a integrated automation estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.