Division 27 and 28 systems

Low voltage estimates that count every drop, device and rack

Low voltage work is won or lost on counts. A missed floor of data drops, a backbone fiber run measured short or a telecom room left off the rack list can erase the margin on an otherwise clean bid. LEEDS takes off structured cabling, wireless, audiovisual, paging, nurse call and security systems device by device, measures the horizontal and backbone runs, prices the pathways, and delivers a bid that holds up when the electrical contractor's scope letter arrives.

Structured cabling and fiberAV, wireless, paging and securityScope matrix against Division 26
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Close-up of a numbered patch panel with blue and gray network patch cords in a telecom rack
Senior reviewed
Per drop

pricing with cable, termination, testing and labor rolled into each outlet

BR Bluebeam Revu
P PlanSwift
TA Trimble Accubid
P Procore
ME Microsoft Excel

Overview

What low voltage estimating covers

Low voltage covers the systems that run on communication and signal cabling rather than branch power: structured cabling for data and voice, fiber backbone between telecom rooms, wireless access points and distributed antenna systems, audiovisual, paging and intercom, sound masking, nurse call, access control, video surveillance, intrusion detection and, where the specification assigns it, fire alarm cabling. Each system has field devices, cable, pathways, head-end equipment and labor, and the estimate quantifies all five.

Horizontal cable is the largest quantity on most jobs. We count drops from the telecom plans and reflected ceiling plans, then measure runs from each outlet back to its telecom room or apply a documented average run length per closet, whichever the drawings support. Backbone fiber and copper are measured from the riser diagram, with strand counts, connector types and slack loops recorded. Telecom rooms are taken off as racks, cabinets, ladder rack, patch panels, cable managers and grounding.

Pathways are where low voltage bids go wrong. J-hooks, sleeves, conduit stubs, cable tray, surface raceway and firestopping are priced from plan runs and ceiling conditions, and we document who owns each in a scope matrix against the electrical contractor. Termination, testing, certification and labeling labor is built up per jack, per panel and per fiber strand, so the labor hours track the counts rather than a percentage of material.

Scope of takeoff

Low voltage scope we quantify

Drops, devices and runs are counted from telecom plans, reflected ceiling plans, riser diagrams and the Division 27 and 28 specifications.

  • EA

    Data and voice drops

    Category 6 and 6A outlets by location, faceplates, jacks, surface boxes and work area cords

  • LF

    Horizontal cable

    Plenum and riser rated category cable by run, with slack, service loops and waste factored

  • LF / STRAND

    Backbone fiber and copper

    Single-mode and multimode fiber, riser copper, connectors, enclosures and splice trays between rooms

  • EA

    Telecom rooms

    Racks, cabinets, ladder rack, patch panels, cable managers, grounding busbars and bonding

  • EA / LF

    Wireless and DAS

    Access point drops and mounts, antennas, coax, remote units and head-end equipment

  • EA

    Audiovisual systems

    Displays, projectors, speakers, microphones, control processors, mounts and AV cabling

  • EA

    Paging, intercom and sound masking

    Speakers, amplifiers, emitters, call stations and zone controllers

  • EA

    Access control and CCTV

    Door hardware packages, readers, controllers, cameras, recorders and licenses

  • EA

    Nurse call and clinical systems

    Patient stations, dome lights, pull cords, staff consoles and real-time location tags

  • LF / EA

    Fire alarm cabling

    Power-limited fire alarm cable, conduit and devices when the specification assigns them to low voltage

  • LF / EA

    Pathways and supports

    J-hooks, sleeves, conduit stubs, cable tray, surface raceway and firestopping at rated walls

  • EA / HRS

    Termination, testing and labeling

    Jack and panel terminations, fiber splicing, certification testing, labeling and as-built records

Estimate types

What type of low voltage estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

  1. 01

    Per-drop budget

    Fast budget using installed cost per drop, per access point and per device, adjusted for building type, ceiling access and distance to telecom rooms.

    Best for General contractors and owners

    Precision±12%
    Turnaround24 hours
  2. 02

    Hard-bid cabling and systems takeoff

    Complete drop counts, measured horizontal and backbone runs, telecom room build-outs, pathways and head-end equipment from the construction set, with a scope matrix against Division 26.

    Best for Low voltage and electrical contractors

    Precision±5-7%
    Turnaround48 hours
  3. 03

    Tenant improvement estimate

    Drops, access points, AV and security changes for tenant spaces, including reuse of existing cabling, landlord head-end coordination and after-hours labor.

    Best for Tenant improvement contractors

    Precision±8%
    Turnaround24-48 hours
  4. 04

    Campus backbone estimate

    Outside plant and inter-building fiber, duct bank, handholes, splice points and building entrance facilities for multi-building sites.

    Best for Campuses, hospitals and districts

    Precision±10%
    Turnaround48-72 hours

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  1. 01

    Drop counts are reconciled between telecom plans, furniture plans and reflected ceiling plans so a relocated workstation does not become a missed outlet.

  2. 02

    Horizontal cable is measured or built from, a documented average run length per room, never from a flat footage per drop.

  3. 03

    Pathways, sleeves and firestopping carry, a scope owner in the matrix so nothing is assumed to belong to the electrical contractor.

  4. 04

    Termination and testing labor tracks the counts per jack, panel and strand, which keeps labor honest on cable-heavy jobs.

  5. 05

    Head-end equipment, licenses and owner-furnished, switches are listed separately so the bid compares cleanly with the integrator's proposal.

  6. 06

    Telecom rooms are taken off as complete build-outs, including grounding, ladder rack and cable management that bids routinely omit.

  7. 07

    Union and open-shop labor rates by region are applied from the start, with productivity adjusted for ceiling height and occupied conditions.

Free quote

Get a fixed quote for this scope

Upload drawings or a plan link and tell us the bid date. A senior estimator confirms scope, price and delivery before any work starts.

  • Scope confirmation and a fixed price within two business hours
  • Most estimates delivered in 24–48 hours
  • Unlimited revisions until bid day
  • Plans stay confidential and are deleted on request

Prefer to talk? Call +1 (800) 555-0199 or email info@leedsestimating.com.

Plans and documents

Drop your plans here or browse

PDF, DWG, DXF, ZIP, PNG, JPG, JPEG, WEBP, XLS, XLSX, DOC, DOCX, CSV · up to 5 files · 4.0 MB total

Plans stay confidential. Reply within 2 business hours.

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

  • XLSX

    Estimate workbook

    Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

  • PDF

    Marked-up plans

    Color-coded takeoff drawings showing exactly where every measured quantity came from.

  • XLSX

    Material procurement list

    Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

  • XLSX

    Labor hours by task

    Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

  • PDF

    Assumptions and exclusions log

    Every clarification, allowance and exclusion documented so your proposal scope is defensible.

  • PDF

    Bid summary sheet

    A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Clients

Who relies on our estimates

From single-trade subs to national developers, every client gets the same measured-twice standard.

General Contractors

Bid more work without adding estimating headcount. We deliver division-by-division numbers you can level against sub quotes.

Subcontractors

Trade-specific takeoffs with labor hours and material lists, ready to drop into your proposal.

Architects & Engineers

Design-stage estimates at every milestone so value engineering happens before documents are finished.

Design-Build Firms

Conceptual through GMP pricing that moves as fast as your design iterations.

Construction Managers

Independent cost checks, change-order pricing and schedule-of-values support.

FAQ

Low Voltage Estimating FAQs

What systems count as low voltage?

Structured cabling for data and voice, fiber backbone, wireless access points and DAS, audiovisual, paging and intercom, sound masking, nurse call, access control, video surveillance and intrusion detection. Fire alarm is included when the specification assigns the cabling or devices to the low voltage contractor.

How do you measure horizontal cable?

Where the drawings show routing, we measure each run from the outlet to its telecom room and add slack and service loops. Where they do not, we calculate an average run length per closet from the floor plan geometry and document the assumption, so the quantity can be checked and adjusted during the site walk.

Who is responsible for pathways and sleeves?

It varies by project, which is exactly why we build a scope matrix against Division 26. Cable tray, conduit, sleeves, J-hooks and firestopping each receive an owner based on the specification and the electrical scope letter, and the price covers only what is assigned to low voltage.

Can you estimate from a tenant's furniture plan?

Yes. Furniture plans are often the most current record of where workstations and displays will sit, so we reconcile them with the telecom plans and flag any outlets that moved or were added. Drop counts are then priced with cable, termination and testing per location.

Do you include testing and certification?

Termination, certification testing, labeling and as-built documentation are built up per jack, per panel and per fiber strand and shown as their own labor lines. Manufacturer warranty registration requirements from the specification are noted where they affect the hours.

How do you handle head-end equipment and licenses?

Switches, servers, recorders, controllers and software licenses are listed separately with a column showing whether they are contractor-furnished or owner-furnished. That keeps the installation bid comparable to competing proposals and avoids doubling up on equipment the owner already purchases.