New clients save 30% on their first estimate

Claim the offer

Division 27 communications

Telecom estimates that count every drop, strand and rack unit

Cabling bids are won and lost on a few details: how many drops per outlet, how far the longest run is, whether the backbone is single-mode or multimode, and how much cable tray the electrician is assuming. LEEDS quantifies structured cabling, fiber, pathways and telecom rooms from the technology drawings, then prices labor by task and certification testing by link, so your number reflects the building as drawn rather than an average cost per square foot.

Technician on a lift working on a cell tower

Per droppricing with average and longest run lengths documented

Cat6 and Cat6A dropsFiber strands countedTesting and labeling included
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Per drop

pricing with average and longest run lengths documented

24–48 hours

Typical turnaround

27 · 26 · 28

CSI divisions

XLSX · PDF

You receive

Telecom scope we quantify

Outlets, strands and rooms are counted from technology plans and riser diagrams.

  • Horizontal copper dropsEA / LF

    Cat6 and Cat6A cabling from outlets and access points to patch panels, including faceplates and jacks

  • Wireless access point cablingEA

    Ceiling drops with slack coils, mounts and pull boxes

  • Backbone fiberSTRANDS / LF

    Single-mode and multimode strands between MDF and IDFs with connectors or splices

  • Backbone copper and tie cablesPAIRS / LF

    Multipair voice cable, protectors and 110-block terminations

  • Racks, cabinets and enclosuresEA

    Two-post and four-post racks, wall-mount cabinets, vertical and horizontal managers

  • Patch panels and terminationsEA / PORTS

    Copper and fiber panels, cassettes, patch cords and labeling

  • Cable tray and pathwaysLF

    Ladder tray, wire basket, conduit sleeves and J-hook supports

  • MDF and IDF build-outEA / LS

    Backboards, grounding busbar, UPS, room power circuits and ceilings

  • Distributed antenna systemsEA / SF

    Head-end, remote units, coax or fiber distribution and antennas for coverage

  • Audio visual and pagingEA

    Display backing, cable pathways, conference room cabling and speakers

  • Firestopping and core drillingEA

    Rated penetration seals and slab or wall core drills

  • Testing, labeling and documentationLINKS / HRS

    Copper and fiber certification, OTDR traces, labeling and as-built drawings

Overview

Where telecom pricing comes from

Division 27 describes the communications backbone of a building: horizontal cabling to every workstation and wireless access point, backbone copper and fiber between telecom rooms, the main and intermediate distribution frames that terminate them, and the pathways that carry it all. The estimate begins with a count of outlets and faceplates on the technology sheets, multiplied by drops per outlet and averaged run length from the nearest telecom room.

Cable category matters. Cat6 and Cat6A differ in cost per foot, in installation labor because of bundle diameter and bend radius, and in how many cables fit a conduit or J-hook. Fiber is counted by strand and terminated by fusion splice or connector. Racks, cabinets, patch panels, cable management, grounding busbars and uninterruptible power supplies are itemized by room, following TIA-568 and BICSI practice.

Pathways often cost more than the cable. Cable tray, conduit sleeves, firestopped core drills, ceiling J-hooks and underfloor duct are quantified in linear feet, and we flag whether Division 26 or 27 carries them. We then add the commissioning scope: labeling, copper and fiber certification, test reports, as-built drawings and the owner's training or turnover documentation.

Estimate types

What type of telecom estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

  1. 01

    Cost per drop budget

    Quick budget using installed cost per drop and per backbone strand, adjusted for ceiling type, run length and room count.

    Best for Early design and TI budgeting

    Precision±12%
    Turnaround24 hours
  2. 02

    Full structured cabling takeoff

    Counts for every drop, strand, rack and pathway from the technology drawings, with labor by task, testing by link and a scope matrix against electrical.

    Best for Cabling contractor bids

    Precision±5-7%
    Turnaround48 hours
  3. 03

    Telecom room build-out estimate

    MDF and IDF construction cost including racks, power, grounding, HVAC coordination and security, shown room by room.

    Best for General contractors

    Precision±8%
    Turnaround24-48 hours
  4. 04

    Campus and DAS estimate

    Outside plant duct bank, manholes, fiber between buildings and in-building cellular coverage priced from the design package.

    Best for Universities, hospitals and venues

    Precision±10%
    Turnaround72 hours

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

Run lengths are documented as average and longest

so cabling labor reflects the building rather than a flat per-drop price.

Cat6, Cat6A and fiber are priced separately,

With bundle sizes and pathway fill checked against conduit and J-hook assumptions.

We tag whether cable tray

sleeves and core drills belong in Division 26 or Division 27, which prevents duplicate or missing scope.

Telecom room build-outs include grounding

UPS, backboards, cooling coordination and door access, not only racks and patch panels.

Certification testing

OTDR traces, labeling and as-built documentation are carried as line items.

Owner-furnished active equipment such as

Switches and access points is separated from contractor-furnished passive infrastructure.

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 01

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 02

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 03

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 04

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Free quote

Get a fixed quote for this scope

Upload drawings or a plan link and tell us the bid date. A senior estimator confirms scope, price and delivery before any work starts.

  • Scope confirmation and a fixed price within two business hours
  • Most estimates delivered in 24–48 hours
  • Unlimited revisions until bid day
  • Plans stay confidential and are deleted on request

Prefer to talk? Call +1 (800) 555-0199 or email info@leedsestimating.com.

Plans and documents

Drop your plans here or browse

PDF, DWG, DXF, ZIP, PNG, JPG, JPEG, WEBP, XLS, XLSX, DOC, DOCX, CSV · up to 5 files · 4.0 MB total

Plans stay confidential. Reply within 2 business hours.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

.xlsx

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

.pdf

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

.xlsx

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

.xlsx

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

.pdf

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

.pdf

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Project types

Project types we estimate

The same measured-twice standard applies whether the scope is a tenant improvement or a ground-up campus.

Technician on a lift working on a cell tower
01

Office tenant improvements

Structural steel frame of a large building being erected with mobile cranes
02

Hospitals and medical campuses

Aerial view of a crew in high-visibility vests screeding and finishing a fresh concrete slab
03

K-12 schools and universities

Hands typing on a laptop displaying a cost spreadsheet in an open office
04

Data centers and server rooms

Scale ruler resting on a set of architectural drawings
05

Hotels and resorts

Multi-story building wrapped in scaffolding under a blue sky
06

Warehouses with wireless coverage

Total station on a tripod set up in front of a construction site with a tower crane
07

Stadiums and entertainment venues

Technician on a lift working on a cell tower
08

Multifamily with building-wide fiber

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Google
“Washington energy code and seismic detailing were reflected in the pricing without us having to explain anything. That is rare for an out-of-state estimator.”

Kim Nakamura

Co-founder, Pacific Build Collective · Seattle, WA

Google
“Lumber lists, finish schedules and allowances in a format our clients actually understand. The assumptions log alone has saved us from two scope disputes.”

Luis Herrera

Project Manager, Sierra Ridge Homes · Phoenix, AZ

Google
“Duct takeoff by gauge and size, equipment schedules, hangers, insulation. They understand sheet metal. Turnaround was 36 hours on a 90,000 square foot clinic.”

Tom Beaulieu

President, Beaulieu Mechanical · Minneapolis, MN

FAQ

Telecom Estimating FAQs

How do you count structured cabling drops?

We count outlets and wireless access points on the technology drawings, apply drops per outlet from the legend, then measure average and longest horizontal runs from each telecom room. Labor is priced by cable category, termination, pathway type and ceiling or wall access conditions.

Do you price fiber backbone by the strand?

Yes. We read the riser diagram for strand counts and type, single-mode or multimode, then price cable per foot with connectors or fusion splices, enclosures and OTDR testing. Strand counts per run are shown so the contractor can verify every connection.

Is cable tray in the telecom or electrical estimate?

It depends on the specification. We tag cable tray, conduit and sleeves by the division and trade responsible, and our scope matrix shows where electrical and telecom contractors overlap. If a project is ambiguous, we price it once and flag it for decision.

Can you estimate DAS and AV systems?

We price infrastructure items shown in the documents, including head-end space, antennas, coax or fiber distribution, display backing, conference room cabling and speaker lines. Active equipment is itemized separately so owner or integrator-furnished components can be removed.

What testing is included?

Copper links are certified to the cable category, fiber is tested for loss, and results are delivered as reports. We also include labeling and as-built updates where the specification requires them, following TIA-568 and BICSI conventions noted in the project documents.

Do you handle outside plant between buildings?

Yes. Duct banks, handholes, manholes, direct-buried conduit, and fiber pulls between buildings are quantified from site and utility sheets. Trenching and restoration are priced with sitework unit costs and tagged to the telecom package.

Ready for a telecom estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.