New clients save 30% on their first estimate

Claim the offer

Insurance restoration

Xactimate estimates that carriers can read and adjusters struggle to cut down

A restoration estimate is only worth what the carrier agrees to pay. We build Xactimate estimates from your photos, measurements and field notes, using the correct price list for the loss zip code and month, a clean sketch, and line items that match the damage documented. Water, fire, wind, hail and storm losses are written to the carrier or TPA format, with supplements ready when hidden damage appears.

Current price listsSupplement supportCarrier and TPA formats
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Quantities verified twice
24 hrs

typical turnaround on residential water and roof losses

24–48 hours

Typical turnaround

01 · 02 · 06 · 07

CSI divisions

XLSX · PDF

You receive

Scope of takeoff

What the service covers

Each loss file is scoped, priced and packaged for submission, then maintained through supplements until the claim closes.

#ItemUnit
  • 01Sketch and room measurementsFloor plans, wall heights, openings, stairs and roof facets drawn from your field dimensions or aerial reportsEA
  • 02Water mitigation line itemsExtraction, containment, antimicrobial, air movers, dehumidifiers and moisture monitoring by category and classHRS
  • 03Fire and smoke restorationSoot removal, deodorization, sealing, ceiling and wall replacement and content cleaningSF
  • 04Wind and hail roof scopeTear-off, underlayment, shingles, flashings, ridge, drip edge, vents and steep or high chargesSF
  • 05Rebuild finishesDrywall, insulation, trim, cabinets, flooring, paint and fixtures at replacement costSF
  • 06Overhead and profitTen and ten application where three or more trades are involved, with justification narrativeLS
  • 07Depreciation and ACVRCV, depreciation by item age and recoverable holdback tracking for payment stagesLS
  • 08Supplement packagesHidden damage, code upgrades, additional drying days and missed line items with photo supportPG
  • 09Contents and pack-outInventory lists, pack-out labor, storage and cleaning by room and categoryEA
  • 10Photo report and narrativeLabeled photos, moisture maps and a damage narrative aligned to estimate line itemsPG
  • 11Carrier and TPA formattingEstimate export, required forms, invoices and file naming per carrier program requirementsLS
  • 12Reinspection responseWritten replies to adjuster revisions, line-by-line dispute notes and revised totalsHRS

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

.xlsx

Estimate workbook

Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

.pdf

Marked-up plans

Color-coded takeoff drawings showing exactly where every measured quantity came from.

.xlsx

Material procurement list

Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

.xlsx

Labor hours by task

Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

.pdf

Assumptions and exclusions log

Every clarification, allowance and exclusion documented so your proposal scope is defensible.

.pdf

Bid summary sheet

A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

What type of xactimate estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Emergency mitigation estimate

Within 8% of final mitigation invoiceSame day to 12 hours

Drying, extraction and containment scope written fast so work authorization and carrier notice can move on the same day.

Best for: Water and fire mitigation contractors

Full rebuild estimate

Matches carrier scope within 5% on documented losses24 to 48 hours

Room-by-room reconstruction with finishes, trade coordination, overhead and profit, and recoverable depreciation tracked.

Best for: General contractors and restoration firms

Roof claim estimate

Within 3% of measured roof area24 hours

Wind and hail scope with facet measurements, shingle line items, flashings and code-required items supported by photos.

Best for: Roofers and storm restoration crews

Supplement package

Line items tied to documented evidence24 hours

Itemized additional scope found after demolition, with revised sketch, justification and photo documentation.

Best for: Contractors disputing underpaid claims

Public adjuster estimate

Itemized to price list by zip and month48 to 72 hours

Policyholder-side estimate prepared independently from the carrier scope, with replacement cost and contents valuations.

Best for: Public adjusters and claim consultants

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

CSI divisions

CSI MasterFormat divisions we cover

Estimates are organized by division so they drop straight into your cost codes and schedule of values.

01General Requirements
02Existing Conditions
03Concrete
04Masonry
05Metals
06Wood, Plastics & Composites
07Thermal & Moisture Protection
08Openings
09Finishes
10Specialties
11Equipment
12Furnishings
13Special Construction
14Conveying Equipment
21Fire Suppression
22Plumbing
23HVAC
25Integrated Automation
26Electrical
27Communications
28Electronic Safety & Security
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
35Waterway & Marine Construction
40Process Interconnections
41Material Processing & Handling
44Pollution & Waste Control Equipment
48Electrical Power Generation

Highlighted divisions are the primary scope on this page.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  • Price list selected by the loss zip code and month of loss, so line items match what the carrier's system uses.
  • Photo evidence attached to every contested item, including steep charges, extra layers, code upgrades and overhead and profit.
  • Sketches built to scale from your dimensions, with room names and wall heights that survive carrier reinspection.
  • Mitigation and rebuild kept in separate estimates so drying invoices are not delayed by reconstruction scoping.
  • Supplements written against the original estimate version, showing what changed, why and what evidence supports it.
  • Estimates delivered in carrier, TPA or program-specific formats rather than a generic export you must rework.

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

“The conduit and wire takeoff matched what my foreman pulled from the drawings almost to the foot. Labor hours were realistic for our crews. It is the first outsourced estimate I did not have to redo.”

Dana Okafor

Owner, Okafor Electric · Houston, TX

Overview

How an Xactimate estimate is built

Xactimate is the estimating platform most property carriers and third-party administrators use to scope and price insured losses. An estimate begins with a sketch of the affected structure, then adds line items by room and trade, such as water extraction, drying equipment days, drywall replacement, insulation, flooring, paint, roofing squares and contents manipulation. Each line pulls its unit price from the price list for the loss location and the month of loss.

The quality of the estimate depends on how closely line items match the evidence. Carriers push back on vague descriptions, duplicate labor, and missing justification for items such as steep or high charges, tear-off layers, code upgrades and overhead and profit. We pair every contested line with a photo reference or note so your adjuster conversation starts from documentation, not argument.

We separate mitigation from rebuild, track depreciation as recoverable or non-recoverable, and report replacement cost value against actual cash value so homeowners and contractors see exactly what is paid now and what is released at completion. When demolition reveals additional damage, we write the supplement with the original estimate version and the new evidence side by side.

FAQ

Xactimate Estimating FAQs

Straight answers on scope, turnaround, pricing and deliverables.

Which price list do you use for an Xactimate estimate?

We use the price list that matches the loss location and the month of loss, since that is what most carriers and TPAs apply when they review. If your claim sits on a different list or a mid-year price update, tell us at intake and we will align the estimate accordingly.

Can you write supplements for claims we already submitted?

Yes. Send the carrier estimate, your original estimate if you have one, and photos of the additional damage. We write the supplement as a revision showing added or changed line items, with the evidence and a short narrative for each so the adjuster can review quickly.

Do you handle both mitigation and reconstruction scopes?

We do both, and we normally keep them as separate estimates. Mitigation covers extraction, drying equipment and monitoring, while reconstruction covers demolition, rebuild and finishes. Separating them lets mitigation invoices be paid on their own timeline and reduces overlap disputes.

What information do you need from my crew in the field?

Labeled photos, room dimensions or an aerial roof report, wall heights, moisture readings for water losses, and notes about materials such as flooring type or shingle layers. A rough sketch or notes on the loss date and policy depreciation terms help us finish faster.

Do you write estimates for public adjusters and policyholders?

Yes. We prepare estimates independent of the carrier scope for public adjusters, attorneys and policyholders, including replacement cost valuations and contents schedules. We do not negotiate with carriers or give legal opinions on coverage, but the estimate gives you a documented basis for the discussion.

How quickly can you turn around a storm-season backlog?

Typical residential files go out within 24 hours of complete photos and measurements. During hail and hurricane surges we assign additional estimators so multiple files move in parallel. Tell us your expected volume ahead of the season and we will reserve capacity for you.

Ready for a xactimate estimating quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.