New clients save 30% on their first estimate

Claim the offer

Document control

Construction documentation that keeps the estimate, the contract and the field in agreement

Estimates drift from reality when the paper trail does. Scope sheets go stale, RFIs sit unanswered, submittals miss a spec section and the schedule of values no longer matches the bid. We prepare and maintain the documents that connect estimating to preconstruction and closeout, in the DOCX, PDF and XLSX formats your project team already uses, with every entry traceable to a sheet or specification section.

RFI and submittal logsSchedule of valuesCloseout packages
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Yellow tower crane rising above scaffolding against a clear blue sky
Architectural blueprints with drafting tools and storage tube
Row of yellow hard hats lined up on a table at a construction site

Overview

The documents behind a defensible estimate

Construction documentation is the set of records that define what is being built, what was priced and what changed along the way.

For estimating and preconstruction it begins with a specification review: reading Division 01 through the technical sections, extracting product requirements, testing and mockup obligations, warranty terms and allowances, and turning them into scope sheets each trade can price against.

As bidding proceeds, questions become RFIs and addenda become tracked revisions. Submittal logs list every required shop drawing, product data sheet and sample by spec section with lead times, so long-lead items such as switchgear, curtain wall and elevators are flagged before the schedule hardens. The bid is then converted into a schedule of values that follows the contract's breakdown and supports pay applications.

After award, the same files keep paying off. A change-order log connects each revision to its pricing backup, and closeout documentation collects warranties, operation manuals, as-builts, attic stock and punch records into an indexed package. The result is one chain from specification to final payment that an owner, lender or auditor can follow.

Scope of takeoff

What the service covers

Each document is produced from the drawings and specifications and delivered in a format you can edit and reuse.

  1. 01

    Specification review reportPG

    Division 00 and 01 conflicts, product requirements, allowances, testing and warranty obligations extracted by section

    Section-by-section read of the project manual

  2. 02

    Trade scope sheetsEA

    Inclusions, exclusions, interfaces and responsibilities written per trade to prevent gaps and overlaps

    Drawings and spec cross-reference

  3. 03

    RFI log and draftingEA

    Numbered questions with sheet and detail references, status, response dates and cost or schedule flags

    Drawing conflict and omission review

  4. 04

    Addendum tracking sheetEA

    Every addendum item mapped to affected quantities, alternates and bid form lines

    Revision cloud comparison

  5. 05

    Submittal registerEA

    Shop drawings, product data, samples and mockups listed by spec section with lead times and reviewers

    Specification submittal paragraphs

  6. 06

    Schedule of valuesLS

    Contract sum divided by CSI division or cost code with retainage and stored-material lines

    Final bid breakdown

  7. 07

    Change-order logEA

    Pricing requests, approved changes, backup, markup and time impacts tracked from request to execution

    Change event register

  8. 08

    Meeting minutes and action listsPG

    Pre-bid, preconstruction and coordination meeting records with owner assignments and due dates

    Meeting notes and recordings

  9. 09

    Long-lead procurement listEA

    Items needing more than eight weeks of delivery flagged against the construction schedule

    Submittal log and supplier input

  10. 10

    Allowance and unit price scheduleEA

    Owner allowances and unit rates listed with quantities, descriptions and reconciliation rules

    Bid form and specifications

  11. 11

    Warranty and O&M indexPG

    Closeout binder index for warranties, manuals, certificates and training records by section

    Specification closeout requirements

  12. 12

    Punch list and closeout trackerEA

    Deficiencies by room and trade with status, photos and final acceptance dates

    Walk-through records

Estimate types

What type of construction documentation can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

  1. 01

    Pre-bid document review

    Specification and drawing review that produces scope sheets, an RFI list and a flag report before pricing begins.

    Best for General contractors starting a hard bid

    PrecisionConflicts logged by sheet and section
    Turnaround2 to 3 days
  2. 02

    Preconstruction record set

    Submittal register, schedule of values, long-lead list and meeting records assembled at award.

    Best for Project managers mobilizing a new job

    PrecisionMatched to final bid breakdown
    Turnaround3 to 5 days
  3. 03

    Change-order documentation

    Backup packages for change requests with quantities, pricing, markup and a narrative that owners can approve.

    Best for Contractors managing frequent owner changes

    PrecisionPriced from measured quantities
    Turnaround24 to 48 hours
  4. 04

    Closeout package

    Indexed warranties, manuals, certificates, as-builts and punch records compiled for owner handover.

    Best for Contractors finishing buildings and final billing

    PrecisionChecked against spec closeout requirements
    TurnaroundPer project size

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

    Then step 2

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

    Then step 3

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

    Then step 4

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

    Bid-ready

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

XLSX

Estimate workbook

PDF

Marked-up plans

XLSX

Material procurement list

XLSX

Labor hours by task

  • Estimate workbook XLSX

    Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

  • Marked-up plans PDF

    Color-coded takeoff drawings showing exactly where every measured quantity came from.

  • Material procurement list XLSX

    Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

  • Labor hours by task XLSX

    Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

  • Assumptions and exclusions log PDF

    Every clarification, allowance and exclusion documented so your proposal scope is defensible.

  • Bid summary sheet PDF

    A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  1. 01

    Document specialists who read the full project manual, not only the drawings, so scope sheets reflect specification requirements.

  2. 02

    Logs formatted for Procore, Excel or your own system so entries import without retyping.

  3. 03

    Cross-referenced to the estimate, so every addendum and change order points to a priced line item.

  4. 04

    Long-lead items identified early enough to, affect the schedule instead of surprising the superintendent.

  5. 05

    Schedules of values structured to support clean pay applications, retainage tracking and lender review.

  6. 06

    Change-order backup that includes quantities, unit pricing and markup logic rather than lump-sum claims.

  7. 07

    Closeout records organized by specification section, which shortens the final inspection and release of retainage.

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Google
“Washington energy code and seismic detailing were reflected in the pricing without us having to explain anything. That is rare for an out-of-state estimator.”

Kim Nakamura

Co-founder, Pacific Build Collective · Seattle, WA

Google
“I used to lose a whole weekend to takeoffs. Now I upload on Friday and have board counts, mud and tape, and paint gallons by Monday morning.”

Elena Vasquez

Owner, Vasquez Drywall & Paint · San Antonio, TX

Clutch
“Change-order pricing came back the same day with quantities tied to the original contract set. The owner approved without a single question.”

Rob Castellano

Senior PM, Castellano Construction Management · Newark, NJ

5,000+Projects estimated
24–48hTypical turnaround
40+Trade categories
98%Takeoff accuracy

FAQ

Construction Documentation FAQs

What does a specification review actually produce?

A written report listing product requirements, allowances, testing and mockup obligations, warranty terms, submittal requirements and conflicts between the specifications and drawings. It is organized by CSI section so estimators and subcontractors can find their scope without reading the entire project manual.

Can you work inside our Procore or project management system?

We can work from exports and deliver logs formatted for import, and with the right permissions we can enter records directly. Many clients prefer Excel logs they can upload in bulk. Tell us which system and fields you use and we will match the structure.

How do you build a schedule of values from a bid?

We take the final bid breakdown and group it by CSI division or your cost codes, then separate stored-material lines, mobilization, general conditions and closeout holdbacks. The totals reconcile to the contract sum, and the structure follows what the owner or lender requires on pay applications.

Do you prepare the answers to RFIs or only the questions?

We draft RFIs and track them, but responses come from the design team. When a response arrives, we record it, mark the affected drawings and flag whether it changes quantities, scope, alternates or schedule so your estimator or project manager can act on it.

Can you assemble closeout documents for a finished project?

Yes. We collect warranties, operation manuals, certificates, as-built references and training records, then index them by specification section into a PDF binder. We also produce a punch and closeout tracker that shows what is outstanding before final payment and retainage release.

Are our documents kept confidential?

We sign NDAs when requested, restrict files to the assigned team and use access-controlled storage. Project documents are used only for your work, and we return or delete files at the end of the engagement according to your instructions.

Ready for a construction documentation quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.