Document control
Construction documentation that keeps the estimate, the contract and the field in agreement
Estimates drift from reality when the paper trail does. Scope sheets go stale, RFIs sit unanswered, submittals miss a spec section and the schedule of values no longer matches the bid. We prepare and maintain the documents that connect estimating to preconstruction and closeout, in the DOCX, PDF and XLSX formats your project team already uses, with every entry traceable to a sheet or specification section.
- 5.0 Google
- 4.9 Trustpilot
- 4.9 Clutch



Overview
The documents behind a defensible estimate
Construction documentation is the set of records that define what is being built, what was priced and what changed along the way.
For estimating and preconstruction it begins with a specification review: reading Division 01 through the technical sections, extracting product requirements, testing and mockup obligations, warranty terms and allowances, and turning them into scope sheets each trade can price against.
As bidding proceeds, questions become RFIs and addenda become tracked revisions. Submittal logs list every required shop drawing, product data sheet and sample by spec section with lead times, so long-lead items such as switchgear, curtain wall and elevators are flagged before the schedule hardens. The bid is then converted into a schedule of values that follows the contract's breakdown and supports pay applications.
After award, the same files keep paying off. A change-order log connects each revision to its pricing backup, and closeout documentation collects warranties, operation manuals, as-builts, attic stock and punch records into an indexed package. The result is one chain from specification to final payment that an owner, lender or auditor can follow.
Scope of takeoff
What the service covers
Each document is produced from the drawings and specifications and delivered in a format you can edit and reuse.
- 01
Specification review reportPG
Division 00 and 01 conflicts, product requirements, allowances, testing and warranty obligations extracted by section
Section-by-section read of the project manual
- 02
Trade scope sheetsEA
Inclusions, exclusions, interfaces and responsibilities written per trade to prevent gaps and overlaps
Drawings and spec cross-reference
- 03
RFI log and draftingEA
Numbered questions with sheet and detail references, status, response dates and cost or schedule flags
Drawing conflict and omission review
- 04
Addendum tracking sheetEA
Every addendum item mapped to affected quantities, alternates and bid form lines
Revision cloud comparison
- 05
Submittal registerEA
Shop drawings, product data, samples and mockups listed by spec section with lead times and reviewers
Specification submittal paragraphs
- 06
Schedule of valuesLS
Contract sum divided by CSI division or cost code with retainage and stored-material lines
Final bid breakdown
- 07
Change-order logEA
Pricing requests, approved changes, backup, markup and time impacts tracked from request to execution
Change event register
- 08
Meeting minutes and action listsPG
Pre-bid, preconstruction and coordination meeting records with owner assignments and due dates
Meeting notes and recordings
- 09
Long-lead procurement listEA
Items needing more than eight weeks of delivery flagged against the construction schedule
Submittal log and supplier input
- 10
Allowance and unit price scheduleEA
Owner allowances and unit rates listed with quantities, descriptions and reconciliation rules
Bid form and specifications
- 11
Warranty and O&M indexPG
Closeout binder index for warranties, manuals, certificates and training records by section
Specification closeout requirements
- 12
Punch list and closeout trackerEA
Deficiencies by room and trade with status, photos and final acceptance dates
Walk-through records
Estimate types
What type of construction documentation can you get?
Match the estimate to where your project is. Every option is priced as a flat fee before work begins.
- 01
Pre-bid document review
Specification and drawing review that produces scope sheets, an RFI list and a flag report before pricing begins.
Best for General contractors starting a hard bid
PrecisionConflicts logged by sheet and sectionTurnaround2 to 3 days - 02
Preconstruction record set
Submittal register, schedule of values, long-lead list and meeting records assembled at award.
Best for Project managers mobilizing a new job
PrecisionMatched to final bid breakdownTurnaround3 to 5 days - 03
Change-order documentation
Backup packages for change requests with quantities, pricing, markup and a narrative that owners can approve.
Best for Contractors managing frequent owner changes
PrecisionPriced from measured quantitiesTurnaround24 to 48 hours - 04
Closeout package
Indexed warranties, manuals, certificates, as-builts and punch records compiled for owner handover.
Best for Contractors finishing buildings and final billing
PrecisionChecked against spec closeout requirementsTurnaroundPer project size
Process
How our estimating process works
Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.
- 1
Upload plans and scope
Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.
Then step 2
- 2
Digital quantity takeoff
Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.
Then step 3
- 3
Pricing and labor
Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.
Then step 4
- 4
Senior review and delivery
A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.
Bid-ready
What's included in your estimate package
Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.
Estimate workbook
Marked-up plans
Material procurement list
Labor hours by task
Estimate workbook XLSX
Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.
Marked-up plans PDF
Color-coded takeoff drawings showing exactly where every measured quantity came from.
Material procurement list XLSX
Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.
Labor hours by task XLSX
Crew-based labor hours and productivity rates so you can check the schedule against the estimate.
Assumptions and exclusions log PDF
Every clarification, allowance and exclusion documented so your proposal scope is defensible.
Bid summary sheet PDF
A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.
Why LEEDS
Why contractors switch to LEEDS
An estimating desk that behaves like an extension of your team, not a software subscription.
- 01
Document specialists who read the full project manual, not only the drawings, so scope sheets reflect specification requirements.
- 02
Logs formatted for Procore, Excel or your own system so entries import without retyping.
- 03
Cross-referenced to the estimate, so every addendum and change order points to a priced line item.
- 04
Long-lead items identified early enough to, affect the schedule instead of surprising the superintendent.
- 05
Schedules of values structured to support clean pay applications, retainage tracking and lender review.
- 06
Change-order backup that includes quantities, unit pricing and markup logic rather than lump-sum claims.
- 07
Closeout records organized by specification section, which shortens the final inspection and release of retainage.
Reviews
What contractors say after their first bid with us
What general contractors, subcontractors and developers say after bidding with our numbers.
“Washington energy code and seismic detailing were reflected in the pricing without us having to explain anything. That is rare for an out-of-state estimator.”
Kim Nakamura
Co-founder, Pacific Build Collective · Seattle, WA
“I used to lose a whole weekend to takeoffs. Now I upload on Friday and have board counts, mud and tape, and paint gallons by Monday morning.”
Elena Vasquez
Owner, Vasquez Drywall & Paint · San Antonio, TX
“Change-order pricing came back the same day with quantities tied to the original contract set. The owner approved without a single question.”
Rob Castellano
Senior PM, Castellano Construction Management · Newark, NJ
FAQ
Construction Documentation FAQs
What does a specification review actually produce?
A written report listing product requirements, allowances, testing and mockup obligations, warranty terms, submittal requirements and conflicts between the specifications and drawings. It is organized by CSI section so estimators and subcontractors can find their scope without reading the entire project manual.
Can you work inside our Procore or project management system?
We can work from exports and deliver logs formatted for import, and with the right permissions we can enter records directly. Many clients prefer Excel logs they can upload in bulk. Tell us which system and fields you use and we will match the structure.
How do you build a schedule of values from a bid?
We take the final bid breakdown and group it by CSI division or your cost codes, then separate stored-material lines, mobilization, general conditions and closeout holdbacks. The totals reconcile to the contract sum, and the structure follows what the owner or lender requires on pay applications.
Do you prepare the answers to RFIs or only the questions?
We draft RFIs and track them, but responses come from the design team. When a response arrives, we record it, mark the affected drawings and flag whether it changes quantities, scope, alternates or schedule so your estimator or project manager can act on it.
Can you assemble closeout documents for a finished project?
Yes. We collect warranties, operation manuals, certificates, as-built references and training records, then index them by specification section into a PDF binder. We also produce a punch and closeout tracker that shows what is outstanding before final payment and retainage release.
Are our documents kept confidential?
We sign NDAs when requested, restrict files to the assigned team and use access-controlled storage. Project documents are used only for your work, and we return or delete files at the end of the engagement according to your instructions.
Ready for a construction documentation quote?
Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.