New clients save 30% on their first estimate

Claim the offer

Bid strategy and submission

Win the bid you can actually build, then submit it without a single compliance error

Most lost bids are not lost on price. They are lost to a missed addendum, a rejected bid form, an alternate left blank or a subcontractor quote that excluded half a trade. Our estimators sit beside your team through the bid cycle, advising on whether to pursue, leveling quotes, building the bid form and checking every submission requirement before the portal closes.

Bid/no-bid analysisQuote levelingBid-day support
Call +1 (800) 555-0199

100%of submissions checked against the instructions to bidders before upload

4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch

Get your consultation & bid submission quote

Fixed price and delivery date within 2 business hours.

Plans and documents

Drop your plans here or browse

PDF, DWG, DXF, ZIP, PNG, JPG, JPEG, WEBP, XLS, XLSX, DOC, DOCX, CSV · up to 5 files · 4.0 MB total

Plans stay confidential. Reply within 2 business hours.

BR Bluebeam Revu
P PlanSwift
SE Sage Estimating
P Procore
ME Microsoft Excel

Scope of takeoff

What the service covers

Each step of the bid cycle, from the go decision through the post-bid conversation, is handled as its own deliverable.

PG

Bid or no-bid analysis

Risk review of contract terms, bonding, schedule, owner history and your available capacity

Scored decision memo

HRS

Bid document review

Instructions to bidders, addenda, general conditions and special requirements checked for traps

Line-by-line read of Division 00 and 01

EA

Scope letters

Trade scope definitions with inclusions, exclusions, addenda acknowledgement and quote deadline

Trade-by-trade template from drawings

EA

Subcontractor solicitation

Bidder lists, invitations, follow-ups and tracking by trade and prequalification status

Bid list tracker

EA

Quote leveling

Side-by-side comparison of subcontractor proposals with gaps, adds and exclusions priced to equal scope

Leveling sheet by CSI division

PG

Bid form preparation

Base bid, alternates, unit prices, allowances and add or deduct values entered exactly as requested

Owner form checked against instructions

EA

Alternates and unit prices

Add and deduct alternates, unit price schedules and allowances priced with their own backup

Separate takeoff per alternate

HRS

Bid-day support

Live phone and email coverage for late quotes, addenda and last-hour number changes

Dedicated bid-day estimator

LS

Plan-room and portal submission

Upload, bid bond, sub lists and required attachments assembled and verified before the deadline

Submission checklist

EA

Compliance check

Bonds, insurance certificates, addenda receipts, minority and local participation forms verified

Checklist sign-off

HRS

Post-bid interview prep

Talking points on schedule, staffing, value engineering and clarification of exclusions

Briefing document and rehearsal

PG

Lessons-learned review

Win/loss comparison against the low bid and the owner's budget for future pursuits

Tabulation and variance notes

Estimate types

What type of consultation & bid submission can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

Bid strategy session

A focused review of one opportunity covering competition, risk, pricing posture and what the owner is really buying.

Accuracy

Decision memo with scored risks

Turnaround

24 hours

Best for

Contractors deciding whether to pursue

Two construction workers in hard hats reviewing plans on a tablet beside a steel structure on a jobsite

98%

takeoff accuracy on awarded projects

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  • Estimators who have submitted public and, private bids and know which compliance errors get a bid thrown out.

  • A written bid or no-bid memo so the decision is documented, defensible and tied to your actual capacity.

  • Scope letters tailored to the drawings rather, than a generic template sent to every subcontractor.

  • Quote leveling that adjusts for missing scope, instead of simply picking the lowest number on the sheet.

  • Addendum tracking that flags changes to quantities, alternates and bid forms before the final number is released.

  • Support for plan-room, email and owner portal submissions, including bid bond and attachment verification.

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

5,000+Projects estimated
24–48hTypical turnaround
40+Trade categories
98%Takeoff accuracy

Overview

Where consultation ends and submission begins

Consultation starts with the bid documents and a plain question: should you bid this job at all. We read the instructions to bidders, bonding and insurance requirements, liquidated damages, owner history and prequalification rules, then compare them with your capacity, crew availability and the likely competition. A written bid or no-bid memo gives your leadership a basis for the decision, not a gut call at the last minute.

Once you commit, the work shifts to execution. We issue scope letters to subcontractors that define inclusions, exclusions and addenda, collect quotes, and level them line by line so a low number is not low because of a missing scope item. Alternates, allowances and unit prices are priced separately and carried to the bid form exactly as the owner requested.

On bid day we stay with your team, track late quotes, adjust for last-minute addenda, and check the form against the instructions before it goes out. After the bid, we help prepare for interviews, value engineering and scope clarification so a low bidder converts to a contract without surprises.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

  • XLSX

    Estimate workbook

    Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

  • PDF

    Marked-up plans

    Color-coded takeoff drawings showing exactly where every measured quantity came from.

  • XLSX

    Material procurement list

    Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

  • XLSX

    Labor hours by task

    Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

  • PDF

    Assumptions and exclusions log

    Every clarification, allowance and exclusion documented so your proposal scope is defensible.

  • PDF

    Bid summary sheet

    A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Clients

Who relies on our estimates

From single-trade subs to national developers, every client gets the same measured-twice standard.

General Contractors Subcontractors Developers & Owners Design-Build Firms

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

Google
“We were turning down bids because our two in-house estimators were buried. LEEDS gave us division-by-division numbers in 48 hours that leveled cleanly against our sub quotes. We bid 40% more work last quarter and our hit rate went up, not down.”

Marcus Whitfield

Chief Estimator, Whitfield Commercial Builders · Charlotte, NC

Direct
“Having a design-development estimate before we finished CDs let us value-engineer the envelope while it still mattered. Clear, fast, and the estimators speak our language.”

Aisha Bello

Principal, Bello Architecture Studio · Atlanta, GA

Trustpilot
“Squares, underlayment, flashing lengths, fastener counts, even the ridge vent. The waste factors were right for the roof pitch. Bid-ready out of the box.”

Greg Lindqvist

Estimator, Summit Roofing Co. · Kansas City, MO

Project types

Project types we estimate

The same measured-twice standard applies whether the scope is a tenant improvement or a ground-up campus.

Public school and municipal buildings
Federal and state agency work
Hospital and healthcare expansions
Commercial tenant improvements
Multifamily and mixed-use buildings
Industrial plants and warehouses
Higher education renovations
Design-build and GMP proposals

FAQ

Consultation & Bid Submission FAQs

What does a bid or no-bid analysis include?

We review the instructions to bidders, contract terms, bonding and insurance needs, liquidated damages, schedule, owner history and your available capacity. The result is a short memo that scores the risks and gives a recommendation, so you can decide before spending days on a takeoff.

Can you submit the bid on our behalf?

We prepare the complete submission package and can upload it to the portal or email it from your account when you authorize that. Most contractors prefer to press the final button themselves, so we verify the form, bond and attachments and hand you a signed-off checklist.

How do you level subcontractor quotes?

We lay each proposal against a common scope outline by CSI division and mark inclusions, exclusions, alternates and clarifications. Missing items are priced from our estimate or a budget allowance, so the comparison is on equal scope. The sheet shows adjusted totals and recommends which bids to carry.

Do you handle alternates, allowances and unit prices?

Yes. Each alternate is priced with its own takeoff and backup so you can see what it adds or deducts. Allowances and unit prices follow the format in the bid form, and we cross-check them against the specification so quantities and descriptions match the owner's documents.

What support do you provide on bid day?

A dedicated estimator stays on call through the final hours to absorb late quotes, run addenda changes, update the bid form and check totals. You get a short checklist to confirm before submission, and we stay reachable until the portal closes or the sealed bid is delivered.

Do you help after the bid is opened?

Yes. We prepare talking points for post-bid interviews, respond to owner clarifications, price value engineering ideas and compare your number with the low bidder. If you lose, we document the variance in a short review so the next pursuit starts with better data.

Ready for a consultation & bid submission quote?

Upload your plans and get a fixed quote within 2 business hours. Most estimates are delivered in 24–48 hours.