Conceptual and feasibility

Know whether a project pencils before the architect draws a single detail

The most consequential cost decision on a project is made when almost nothing is drawn: buy the land, commission the design, or walk away. A preliminary estimate gives you a defensible range from a program, a site and a sketch. We use cost per square foot, parametric and assembly models, carry explicit contingency and tell you plainly what the range means for a go or no-go decision.

AACE Class 5 to 4Parametric and assembly modelsGo or no-go ready
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch
Person drafting plans on a blueprint
Senior reviewed
-20% / +30%

typical accuracy range for Class 4 conceptual estimates

BR Bluebeam Revu
RD RSMeans Data
P Procore
ME Microsoft Excel

Overview

What a preliminary estimate can and cannot tell you

A preliminary estimate is a cost forecast prepared before the design can support a measured takeoff. Under AACE International's classification it falls into Class 5, with less than 2% of design complete and a range of roughly -30% to +50%, or Class 4, with 1% to 15% complete and a range closer to -20% to +30%. The wide ranges are honest: the estimate depends on what the project will become. We also state which design decisions the number is most sensitive to, such as the structural system, number of floors and level of exterior finish.

We build the number from the information that exists. Early work uses cost per square foot from comparable buildings, adjusted for location, quality level, floor count and site conditions. As sketches firm up, we shift to assemblies, such as cost per square foot of exterior wall, per ton of structural steel, per bed or per key, which respond to design decisions instead of ignoring them. Each model is calibrated to completed projects of the same building type in your region, so the benchmark is local, current and traceable to real project data.

Contingency is shown, not hidden. Design contingency, escalation to the midpoint of construction and an allowance for unknowns each appear as separate lines. The report ends with a recommendation framed around the decision: does this project clear your return threshold at the high end of the range, and which scope drivers would move the number most? Where the range is too wide to support the decision, we say so and identify the cheapest piece of additional information, such as a soil boring or a massing study, that would narrow it.

Scope of takeoff

Inputs and cost elements we model

Each element is priced from the level of design information available and is tightened as the drawings develop.

  • SF

    Program and gross area

    Net-to-gross ratios, floor count and efficiency assumptions from the owner's program

  • $/SF

    Cost per square foot benchmark

    Comparable building costs adjusted for quality tier, location and market conditions

  • SF / CY

    Substructure and foundations

    Footing and slab systems sized from assumed loads and geotechnical risk

  • $/SF of wall / floor

    Shell and superstructure

    Frame, floors, roof and exterior enclosure by assembly

  • $/SF

    Interior construction and finishes

    Partitions, doors, ceilings and floor finishes by quality grade

  • $/SF

    Mechanical, electrical and plumbing

    Systems priced by watts per SF, tons per SF and fixture count assumptions

  • SF / LS

    Site and utilities

    Grading, paving, utilities and landscape sized from site area and layout

  • LS / $/SF

    Special conditions

    Demolition, hazardous abatement, difficult soils, historic requirements and phasing

  • % / LS

    General conditions and fees

    Supervision, insurance, bonds, overhead and profit applied to direct cost

  • %

    Design contingency

    Allowance for design development changes, tapering as documents progress

  • % / YR

    Escalation

    Cost growth from estimate date to the midpoint of construction

  • $

    Range and go or no-go summary

    Low, expected and high cost with the drivers most likely to move each

Estimate types

What type of preliminary estimating can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

  1. 01

    Order-of-magnitude estimate

    A single cost range from building type, area and location, prepared before any sketch exists.

    Best for Early feasibility screening

    PrecisionClass 5: -30% / +50%
    Turnaround24 hours
  2. 02

    Conceptual estimate

    A parametric estimate from a program and massing sketch, with major systems priced by assembly.

    Best for Owner budgets and land acquisition

    PrecisionClass 4: -20% / +30%
    Turnaround2-3 days
  3. 03

    Feasibility study estimate

    A cost model paired with pro forma inputs so a lender or investment committee can assess viability.

    Best for Developers and lenders

    PrecisionClass 4 range
    Turnaround3-5 days
  4. 04

    Alternative scheme comparison

    Two or three design options priced on a common basis, showing the cost impact of each decision.

    Best for Choosing between structural or massing options

    PrecisionClass 4 relative accuracy
    Turnaround3-4 days
  5. 05

    Budget validation

    An independent check of a design team's or contractor's early budget against benchmark data.

    Best for Owners reviewing a first number

    PrecisionClass 4 to 3
    Turnaround2 days

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

  1. 01

    Every estimate is labeled with its AACE class and expected range, so you know how much weight the number can carry.

  2. 02

    Models shift from cost per square foot to, assemblies as the design develops, which lets the estimate respond to real design decisions.

  3. 03

    Contingency, escalation and risk allowances, appear as separate lines instead of being buried inside unit rates.

  4. 04

    We price alternatives on a common basis so, choices like steel versus concrete frame are compared fairly.

  5. 05

    Reports end with a plain recommendation on, whether the project clears your return target at the high end of the range.

  6. 06

    Benchmarks come from completed projects of the same type and region, adjusted for quality tier and market conditions.

  7. 07

    As the design advances, the preliminary estimate becomes the baseline for the detailed estimate, with variances explained.

Free quote

Get a fixed quote for this scope

Upload drawings or a plan link and tell us the bid date. A senior estimator confirms scope, price and delivery before any work starts.

  • Scope confirmation and a fixed price within two business hours
  • Most estimates delivered in 24–48 hours
  • Unlimited revisions until bid day
  • Plans stay confidential and are deleted on request

Prefer to talk? Call +1 (800) 555-0199 or email info@leedsestimating.com.

Plans and documents

Drop your plans here or browse

PDF, DWG, DXF, ZIP, PNG, JPG, JPEG, WEBP, XLS, XLSX, DOC, DOCX, CSV · up to 5 files · 4.0 MB total

Plans stay confidential. Reply within 2 business hours.

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 1

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 2

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 3

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 4

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

  • XLSX

    Estimate workbook

    Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

  • PDF

    Marked-up plans

    Color-coded takeoff drawings showing exactly where every measured quantity came from.

  • XLSX

    Material procurement list

    Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

  • XLSX

    Labor hours by task

    Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

  • PDF

    Assumptions and exclusions log

    Every clarification, allowance and exclusion documented so your proposal scope is defensible.

  • PDF

    Bid summary sheet

    A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Clients

Who relies on our estimates

From single-trade subs to national developers, every client gets the same measured-twice standard.

Developers & Owners

Feasibility budgets and bid reviews that tell you whether the numbers you are seeing are fair.

Architects & Engineers

Design-stage estimates at every milestone so value engineering happens before documents are finished.

Design-Build Firms

Conceptual through GMP pricing that moves as fast as your design iterations.

Construction Managers

Independent cost checks, change-order pricing and schedule-of-values support.

Lenders & Insurers

Replacement cost and draw-schedule estimates documented to underwriting standards.

FAQ

Preliminary Estimating FAQs

How accurate is a preliminary estimate?

It depends on how much design exists. Class 5 estimates, prepared with almost no drawings, run about -30% to +50%. Class 4 estimates from a program and sketch run closer to -20% to +30%. We state the class and range on every estimate, so you understand how much confidence the number deserves.

What information do you need to start?

Building type, approximate gross area, location, number of stories and desired quality level are enough for an order-of-magnitude figure. A site plan, massing sketch, program, geotechnical report or comparable project cost make the estimate tighter, and we tell you which items would most improve accuracy. We add notes on what would tighten the range.

Do you include land cost and soft costs?

Our standard estimate covers hard construction cost with contingency and escalation. On request we add soft costs such as design fees, permits, testing, furniture and financing carry, using percentages typical for the building type, so you see a full project budget alongside the construction number.

How much contingency should be carried?

Design contingency usually runs 15% to 25% at Class 5, falling to 10% or less at design development, with a separate allowance for escalation. We show both, explain the basis, and suggest where the percentage should drop as specific risks are resolved by design or investigation.

Can you compare two design options?

Yes. We price each scheme on the same basis and show the differences in structure, envelope, systems and site cost, so the comparison reflects design choices instead of pricing inconsistencies. Owners often use these comparisons to decide between a steel and a concrete frame, or a four-story and five-story scheme.

What happens to the estimate when design develops?

We update it at milestones, usually schematic design and design development, and show a variance report explaining what moved the number. This keeps the original budget as the baseline, so the design team and owner see the cost consequence of each decision as it is made.