Quantity surveying · Cost control

Quantity surveying that follows the money from first sketch to final account

In much of the world, a quantity surveyor owns the cost of a project from feasibility through handover. In the United States that role is often split across an estimator, a project manager and an accountant, and the gaps cost real money. Our surveyors apply RICS-style practice to American projects, covering cost plans, bills of quantities, tender evaluation, monthly valuations, variations and the final account.

RICS-style practiceTender to final accountOwner and contractor side
4.9/5 from 180+ contractors
  • 5.0 Google
  • 4.9 Trustpilot
  • 4.9 Clutch

Estimate workbook

quantity-surveying-services-estimate-workbook.xlsx

Marked-up plans

quantity-surveying-services-marked-up-plans.pdf

Material procurement list

quantity-surveying-services-material-procurement-list.xlsx

Labor hours by task

quantity-surveying-services-labor-hours-by-task.xlsx

Delivered in 24–48 hours
BR Bluebeam Revu
RD RSMeans Data
SE Sage Estimating
P Procore
ME Microsoft Excel

Overview

What a quantity surveyor does that an estimator does not

An estimator answers one question: what will this cost to build? A quantity surveyor answers a longer one: what should it cost, what is it costing, and why do those two numbers differ? The work starts with an elemental cost plan that allocates the budget to foundations, frame, envelope, services and finishes, then follows the design as it develops, reporting each time a revision pushes an element over its target.

Cost reports are issued at every design milestone, giving owners and architects a shared, written record of how each decision moved the budget.

At tender, the surveyor prepares a bill of quantities, or a measured schedule of rates, so every bidder prices identical scope and the results compare line by line. During construction the role shifts to certifying value: measuring work in place for monthly valuations, assessing variations and instructions, tracking provisional sums and keeping a running forecast of the final cost. Every valuation is backed by measurement sheets and photographs, which keeps payment discussions anchored to what was physically built, and disagreements are settled with a tape measure instead of opinion.

The final account closes the loop. We reconcile the contract sum against approved variations, remeasured provisional items, delay and acceleration claims, and retention release, then issue a statement both sides can sign. Owners get a defensible number, and contractors get paid for what they built without a year of dispute. The statement also records lessons for the next project, noting which rates held, which provisional items ran over and where the original cost plan was thin, which makes the next budget more reliable for everyone involved.

Scope of takeoff

Quantity surveying services across the project lifecycle

Each service maps to a stage of the project and produces a document your team can act on.

#ItemUnit
  • 01Elemental cost planBudget allocated by building element, with cost per SF targets and design-stage reconciliation$/SF / %
  • 02Bill of quantitiesMeasured items with descriptions, units and quantities for uniform tender pricingSF / CY / LF / EA
  • 03Tender documents and instructionsPreambles, preliminaries, pricing notes and bid forms that make tenders comparableLS
  • 04Tender evaluation and levelingArithmetic checks, scope gap analysis and ranked recommendation lettersLS
  • 05Contract sum analysisAwarded sum split into a priced schedule for valuation and cash flowLS / %
  • 06Monthly valuationsWork in place measured and certified against the schedule of values, with materials on site$ / %
  • 07Variations and change valuationsInstructed changes priced from contract rates, daywork and net-cost-plus-fee$ / HRS
  • 08Provisional sums and allowancesTracking of allowance draw-down and remeasurement of work with undefined scope$ / LS
  • 09Cost-to-complete forecastRolling forecast of final account including approved, pending and anticipated changes$
  • 10Claims and extension of time supportQuantified delay, disruption and acceleration costs with supporting records$ / DAYS
  • 11Final accountReconciliation of contract sum, adjustments, retention and release for sign-off$
  • 12Lifecycle and post-occupancy costingMaintenance and replacement forecasts for owners holding the asset$/YR

Deliverables

What's included in your estimate package

Every deliverable is formatted so it can go straight into a proposal, a purchase order or an owner report.

  • XLSX

    Estimate workbook

    Quantities, unit costs, labor hours and totals organized by CSI division, with subtotals, markups and a bid summary tab.

  • PDF

    Marked-up plans

    Color-coded takeoff drawings showing exactly where every measured quantity came from.

  • XLSX

    Material procurement list

    Consolidated material quantities with waste factors applied, ready to send to suppliers for quotes.

  • XLSX

    Labor hours by task

    Crew-based labor hours and productivity rates so you can check the schedule against the estimate.

  • PDF

    Assumptions and exclusions log

    Every clarification, allowance and exclusion documented so your proposal scope is defensible.

  • PDF

    Bid summary sheet

    A proposal-ready one-page summary with overhead, profit, bonds and contingency applied.

Estimate types

What type of quantity surveying can you get?

Match the estimate to where your project is. Every option is priced as a flat fee before work begins.

01

Cost plan

An elemental budget framework produced during schematic and design development, updated as the design evolves.

Accuracy
Class 4 to 3 range
Turnaround
3-5 days
02

Bill of quantities

A full measured schedule that lets every contractor price identical scope on a tender.

Accuracy
Measured to the drawing
Turnaround
5-10 days
03

Valuation package

A monthly certification of work in place with supporting measurements and a recommended payment amount.

Accuracy
Verified on site
Turnaround
2-3 days per cycle
04

Variation assessment

A priced evaluation of an instructed change, using contract rates first and daywork where no rate exists.

Accuracy
Contract-rate based
Turnaround
24-48 hours
05

Final account statement

The closing reconciliation of contract sum, changes, provisional items and retention.

Accuracy
Agreed to the dollar
Turnaround
2-3 weeks

Process

How our estimating process works

Four steps from upload to a bid-ready estimate, with a senior estimator signing off before anything leaves our desk.

  1. 01

    Upload plans and scope

    Send your drawings, specifications and bid invitation through the secure upload form. We confirm scope, deadline and a fixed price within two business hours.

  2. 02

    Digital quantity takeoff

    Estimators measure every item from calibrated plans in Bluebeam and PlanSwift, color-coding each layer so quantities can be traced back to the drawing.

  3. 03

    Pricing and labor

    Quantities are priced with location-adjusted material costs, crew productivity rates and equipment, then marked up to your overhead and profit targets.

  4. 04

    Senior review and delivery

    A second estimator audits quantities and pricing, documents assumptions and exclusions, and delivers your Excel workbook, PDF summary and marked-up plans.

Why LEEDS

Why contractors switch to LEEDS

An estimating desk that behaves like an extension of your team, not a software subscription.

Surveyors trained in RICS-style practice

adapted to AIA contract forms, American retainage and the way US owners actually procure work.

Cost plans that follow the design through every revision

with a written reconciliation each time an element exceeds its target.

Bills of quantities that make tenders comparable line by line

which removes the guesswork from bid review.

Valuations based on work measured in place and supported by photos

not on percentage estimates from the contractor alone.

Variation pricing from contract rates and agreed daywork

so change orders are settled on evidence instead of negotiation fatigue.

A rolling cost-to-complete forecast that

Shows owners the likely final number months before close-out.

Project types

Project types we estimate

The same measured-twice standard applies whether the scope is a tenant improvement or a ground-up campus.

Owner-developed mixed-use projects
Public school and municipal buildings
Hospital and clinic expansions
Multifamily projects with construction lenders
Hotel and resort builds
Design-build projects with GMP contracts
Cultural and institutional facilities
Overseas-funded projects built in the US

Reviews

What contractors say after their first bid with us

What general contractors, subcontractors and developers say after bidding with our numbers.

“We use LEEDS for independent bid reviews on every multifamily deal. Their preliminary numbers have landed within 6% of final GMP on three projects in a row.”

Priya Raman

Development Manager, Northgate Partners · Denver, CO

FAQ

Quantity Surveying FAQs

Straight answers on scope, turnaround, pricing and deliverables.

Is quantity surveying common in the United States?

The title is less common, but the functions are all performed: cost planning, tender evaluation, pay application review and change order pricing. They are usually divided among several roles. Our service consolidates them under one accountable surveyor, giving owners and contractors a single, consistent view of cost throughout the project.

Do you work for owners or for contractors?

Both, and we state which side we serve at the outset. Owners and lenders hire us for cost plans, tender review and valuations. Contractors hire us for variation pricing, claims support and final account preparation. We do not act for opposing parties on the same contract.

What is a bill of quantities and why use one?

A bill of quantities lists every measured item of work with a description, unit and quantity. All bidders price the same list, so bids compare line by line and scope gaps surface before award. It also gives a ready-made schedule for valuing work and pricing changes later.

How do you assess variations and change orders?

We price changed work from the contract's own rates wherever applicable, then fall back to measured rates built from labor, material and equipment, and daywork only when the work cannot be measured. Each assessment includes the basis, supporting records and any time impact, so it can be reviewed quickly.

What is included in a final account?

The original contract sum, all approved variations, remeasured provisional sums, agreed claims, deductions for defects or omissions, and retention. We present the reconciliation in a single statement with supporting schedules, ready for both parties to sign and for the lender to release the final payment.

Can you review a contractor's pay application?

Yes. We compare the claimed percentage complete against measurements of work in place, check stored materials and review billing against the schedule of values. The result is a recommended payment amount with notes on any line that appears overbilled or underbilled. We also note any lines needing documentary evidence.